Hospital incinerator manufacturers


SECTION V

 

  • TECHNICAL SPECIFICATIONS OF THE INCINERATOR

 

  • General Description

 

The plant has to have four distinct sections that show three principles of turbulence, residence time and temperature retention. The regulated sections could include but not limited to:

 

  1. Overall plant layout
  2. Feed chamber/charging
  3. Primary combustion chamber
  4. Particulate scrubbers
  5. Acid gas
  6. The stack/chimney.
  7. Minimum capacity of primary chamber = 10cubic meters
  8. Burn rate (rate of waste incineration) = 10 kg per hour
  9. Should have a full width counterbalance loading door allowing easy access to the main chamber for loading and removing ash.
  10. The INCINERATOR should be NEMA approved in accordance with Environmental management and coordination (Waste management) Regulations of 2006.

 

  • Scope Of Work

 

The job specified in the contract will probably include.

 

  1. Supply, install and commission an incinerator as provided   in the technical specifications

 

  1. Provision for adherence to OSHA and other statutory requirement relating to Health and Safety of workers during execution of the works covered in this

 

  1. Assessment and preparation  and construction of  a standard incinerator shed with one waste  storage room  ( see the design )

 

  1. Provision of operation and maintenance manuals and drawings complete with maintenance schedule and

 

  1. Fuel oil storage tank- Mild steel 1000 liters capacity

 

  1. Onsite training for operation and maintenance

 

IMPORTANT

To allow the Employer undertake conclusive evaluation of the tender, tenderers are requested to submit with their offers the detailed specifications, drawings and catalogues with Commissioning and maintenance instructions for the Incinerator they intend to Supply, install and commission.

Tenderers who don’t obey this requirement fully shall have their tender refused.

 

  1. TECHICAL SPECIFICATIONS OF THE INCINERATOR

 

3.1  Feeding and Charging

 

Controlled sterile mechanical feeding that doesn’t negatively influence the air temperature at the primary and secondary chambers of the incinerator shall be utilized.

 

  • Primary Combustion

 

  • This chamber should be equipped with burners that use low sulphur
  • The chamber should ensure a minimum exit temperature of 850 degrees
  • This unit should operate at over 1100 deg C to ensure complete
  • This chamber should be equipped with burners that use low sulphur
  • Heavy-duty steel casing
  • High quality refractory lining and insulation
  • Large full size top load door and liquid retention
  • 1 x oil fired ignition burners operated on/off

 

 

  • Secondary Combustion Chamber (After burner)

 

  1. Heavy-duty steel casing
  2. High quality refractory lining and insulation
  3. 1 x oil burner
  4. Should be fitted with burners that use low sulphur
  5. Ensure secondary air supply is controlled.
  6. Ensure residence time is not less than two seconds.
  7. Ensure that the gas temperature as measured against the inside wall in the secondary chamber and not in the flame zone is not less than 1100 degrees
  8. Ensure the emitted oxygen content of the emitted gases is not less than 11%
  9. Ensure both primary and secondary combustion temperatures are maintained until all waste is completely

 

  • Particulate Removers

A mechanical particulate collector has to be integrated following secondary combustion chamber for removal of particulate pollutants entrained in the flue gas flow. The particulate collectors may incorporate any of the following or some combination thereof:

 

  1. Cyclone separator
  2. Electrostatic precipitators
  3. Fabric filters

 

  • Chimney/Stack

 

  1. The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
  2. The chimney should be visible to the operator from the feeding

 

  1. The minimum exit velocity should be 10 meters per second and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
  2. The point for measurement of emissions shall be

 

  • Instrumentation

 

  1. Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary
  2. An audible and visible alarm must be installed to warn the operator when the secondary chamber temperature drops to below the required
  3. A carbon monoxide and oxygen meter/recorder should be
  4. A smoke density meter/recorder should be
  5. A solid particulate meter/recorder should be
  6. Any other instrument that may be considered

 

  • Location / Siting of the Incinerator

 

  1. a) The incinerator must be sited in accordance with the relevant local municipal authority planning regulations and the topography of the site must be compatible with premises in the

 

  • Emission Limits

 

  1. Combustion efficiency (C.E) shall be at least00% where C.E = %Carbon dioxide x 100 / [% Carbon dioxide + carbon monoxide]
  2. The temperature of the primary chamber shall be 800 +/- 50 degrees centigrade
  3. The secondary chamber gas residence time shall be at least 1 second at 1050 +/- 50 degrees centigrade with 3% oxygen in the stack
  4. Opacity of the smoke must not exceed 20% viewed from 50 metres with naked
  5. All the emission to the air other than steam or water vapour must be odourless and free of mist, fume and
  6. A 99.99% destruction and removal efficiency (DRE) for each principal organic hazardous constituent (POHC) in the waste feed where DRE [ ( Win – Wout) /Win ] x

100 where Win = mass feed rate of the POHC in the waste stream fed to incinerator and Wout = mass emission rate of POHC in the stack before the release into the atmosphere.

  1. The average dioxin and furan concentration in the emission should not exceed 80mg/m3 total dioxins and furans if measured for a period of 6 to 16

 

  • Ease of Use

 

  1. Auto
  2. No pilots to
  3. Automatic control and temperature monitoring
  4. Built-in skid facilitates placement

 

  • Fuel Efficiency

 

  1. Rapid incineration means low fuel

 

  1. Up to 20kgs per hour (dependant on application).
  2. Thick refractory lining rated to 1400 deg C in main chamber retains heat, increasing

 

  • Quality Built to Last

 

  1. Heat resistant 3mm
  2. Stainless steel

 

  • Key Features

 

  1. Low running and maintenance costs
  2. Fully Automatic and simple to operate control panel
  3. Afterburner Preheat
  4. Incineration Temperatures in Excess of 900 degrees C
  5. 3 mm Steel Casing and Fully insulated
  6. Dense Refractory Concrete Lining Rated to 1400 degrees C
  7. Solid Hearth to Allow Maximum Burnout
  8. Large Top Opening Lid For Easy Loading
  9. Stainless Steel Flue as standard
  10. 12 Months or 1000 hours
  11. Optional Stainless Steel Casing
  12. Heat Recovery System option

 

3.13 Fuel and Capacity  
1. Low sulphur fuel
2. Capacity (Cubic Mtr) .10
3. Average Capacity 40kg
4. Fuel Consumption (ltrs / hr) 3

 

  • External Dimensions

 

1. Length (mm)               735  
2. Width (mm)                500
3. Height Incl. Flue (mm) 1960
4. Door Opening (mm) 325 x 325

 

  • Internal Dimensions

 

1. Length (mm) 620
2. Width (mm) 390
3. Height 500

 

  • Operation

 

  1. Minimum Operating Temperature 950
  2. Maximum Operating Temperature 1320

 

 

3. Burn rate per hour 5-20kgs
4. Temperature Monitoring Available

 

 

  • Particulate Removers

 

 

A mechanical particulate collector must be integrated following secondary combustion chamber for removal of particulate pollutants entrained in the flue gas flow. The particulate collectors may include any of the following or some combination thereof:

 

  1. Cyclone separator
  2. Electrostatic precipitators
  3. Fabric filters

 

  • Chimney /Stack

 

 

  • The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all The topography and height of adjacent buildings within 50 meters radius should be taken into account.
  • If possible the chimney should be visible to the operator from the feeding
  • The addition of dilution air after combustion in order to achieve the requirement of these guidelines is
  • The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed x 2) whichever is higher to ensure no down washing of exiting
  • Point for the measurement of emissions shall be

 

  • Control Panel

 

  1. Control of 2 burners
  2. Timer control 0- 12 hours
  3. Integral fan timer control
  4. Temperature and thermostatic control

 

 

 

 

 

 

 

SCHEDULE Two

 

 

NO: REQUIREMENTS SUPPLIER’S REMARKS
1. Experience

 

Previous experience in the supply, installation and commissioning of  incinerators

 
2. 1 Year Maintenance Contract  
3. Work rate

 

at least10kg Every Day

 
4. Design

 

Fundamental Plan layout to Provide Overall plant design. With Grant room / charging, Primary Combustion Chamber. Particulate Scrubbers, Acid Gas Scrubbers, The stack/ chimney.

 

Fuel oil tank storage should be   moderate steel 1000 liters capacity

 

Chimney Height should be of 10 meters above floor level.

Housing facility with one waste storage room

 

 

Provide Housing designs with sufficient cross ventilation

 

Chamber (Afterburner Maximum exit temperature shouldn’t be less than 1100oC

 
5. Standard control panel

 

Safety interlock, Fan Starter, Burner on/ off switch/door safety switch, Vehicle shut down change, temperatures controller mechanism.

 
6. Combustion Chambers

 

Primary Combustion Chamber Minimum exit temperature should not be less than 850oC

 

Secondary Combustion Maximum exit temperature should be less than 1100oC

 

 

SECTION VII

 

PRICE SCHEDULE FOR GOODS

 

Cost timetable for Supply, Installation, Testing and Commissioning of an incinerator for Turkwel Power Station

 

1 2 3 4 5 6
Item Description Unit of sale Quantity Unit price Total price
1. Supply, install, and commission the incinerator as specified. LOT 1    
2. Construct a standard incinerator housing facility as per the drawing and architectural notes provided  

LOT

 

1

   
4. Construct one  waste  storage  room (provide specs on room size, construction material etc) LOT 1    
5. Supply / adhere to  the requirement of OSHA 2007 act

49,50,51,60,61,77,78,79,80,81,100

LOT 1    
6. Onsite training of Operation and Maintenance staff. LOT 1    
7. All the key Spares (Attach a separate List) LOT 1    
8. Supply and install 1000 liters Fuel oil storage tank and its secondary containment with Diesel oil level indicator and necessary piping with valves for visual checking of fuel level. LOT 1    
9. Supply of Operation and Maintenance Manuals.  

LOT

1    
10. All other items not specified but necessary to complete the Installation.   A separate list of these items to be attached.  

LOT

1    

 

 

11. Fencing of  a compound  of 10 meter length  by 10 meter  width   using Concrete  poles  high Gauge mesh wire , and a lockable gate. (Indicate size and design of gate) LOT 1    
  Sub Total        
           
  Discount  (%) if any        
  Applicable Taxes and Duties        
           
  Total Cost in Kshs        

 


Steps of waste management


Item

Specification

Model

A1500

Internal Dimensions

150 x 100 x 96cm

Suit for Animal

Cat – yes

Dog – yes

Pig – yes

Cow – Little

Main Product List

Main Combustion Chamber

 

Secondary Combustion Chamber

 

Mix-Combustion Chamber

 

Wet Scrubber( Washing Tower)

 

Incinerator Control Case

 

Chimney:10.0Meters *(Update to Stainless Steel, free Price )

 

Italy oil burner: 03 sets

 


Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Oil Tank: 500Liters

Nanjing Clover Medical Technology Co.,Ltd.

HICLOVER Incinerator/Parts Range

Main Feature

Medical Waste Incinerators

HICLOVER 10-500kgs/Hr.Double Combustion Chambers

Single Combustion Chamber

Small, Cheap,10-20kgs/Hr.

Three Combustion Chambers(Optional)

3 Chambers for high risk waste

Pet Cremation Equipment

For Pet(small/big) Cremation Business

Animal Incineration Equipment

For other animal incineration

hospital waste management ppt 2018


Items/Model

TS100(PLC)

TS150(PLC)

TS300(PLC)

TS500(PLC)

Burn Rate (Average)

100 kg/hour

150 kg/hour

300 kg/hour

500 kg/hour

Control Mode

PLC Auto.

PLC Auto.

PLC Auto.

PLC Auto.

Combustion Chamber

1200L

1500L

2000L

3000L

Internal Dimensions

120x100x100cm

150x100x100cm

170x120x100cm

210x120x120cm

Secondary Chamber

600L

750L

1000L

1500L

Smoke Filter Chamber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Feed Mode

Manual

Manual

Manual

Manual

Voltage

220V

220V

220V

220V

Power

1.38Kw

1.69Kw

2.57Kw

4.88Kw

Diesel Oil Consumption (kg/hour)

Ave.20.4

Ave.24.2

Ave.33

Ave.44

Natural Gas Consumption (m3n/hour)

Ave.24.5

Ave.29

Ave.39.6

Ave.52.8

Temperature Monitor

Yes

Yes

Yes

Yes

Temperature Protection

Yes

Yes

Yes

Yes

Oil Tank

200L

300L

500L

500L

Chimney

10Meter

10Meter

14Meter

14Meter

Chimney Type

Stainless Steel

Stainless Steel

Stainless Steel

Stainless Steel

1st. Chamber Temperature

800℃–1000℃

800℃–1000℃

800℃–1000℃

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

Residency Time

2.0 Sec.

2.0 Sec.

2.0 Sec.

2.0 Sec.

Gross Weight

6000kg

8500kg

11000kg

16000kg

External Dimensions

260x150x180cm

300x160x190cm

400x210x300cm


brick incinerator design,The control system shall include an electronic performance monitoring and logging system. The system shall be capable of monitoring and logging chamber temperatures at regular intervals (not less than once per minute, with the capacity to vary the logging frequency). The system shall include the capacity to download the performance data by USB connection.
All the measuring devices attached with the incinerator should have digital display and should have provision of connecting to the recording system, which should include fuel meter and separate energy meter.
The temperature shall be determined against the inside wall of the combustion chambers. An audible and visible alarm shall be installed to warn the operator when the secondary temperature drops to below the required temperature.
The primary chamber must meet or exceed the following criteria:
“• Heavy steel construction.
• Fixed hearth geometry and starved air gasification operational mode. 
• Hot face refractory concrete-ceramic suitable for thermal shock up to 1400 Celsius and abrasion. Minimum thickness 150mm. 
• Cold face refractory lining of calcium silicate or superior material, minimum thickness 100mm. 
• Refractory lining of all the ducts shall be done with refractory castings. Superior quality ceramic wool shall be used at all hot duct flanges and expansion joints.
• Multiple electric ignition fuel burners designed to use automotive diesel fuel.
• Flame of the primary burner shall be oriented towards the center of the unit which does not impinge directly on the refractory floor or wall. The secondary burner shall be positioned in such a way that the flue gas passes through the flame. 
• The unit shall prevent leakage of the hot flue gas and any backfire. 
• An electrically powered fan forced air supply, with the capacity for variation by the operator.
• Digital thermometers connected to electronic dataloggers. The thermometers shall be located on the chamber walls away from the fuel burner.
• A differential air pressure gauge connected to an electronic datalogger

 CE Certification Pass

HICLOVER Solution for Fighting COVID-19 with CE Certification.
 
1. Medical Waste Incinerator(Containerized Mobile Incinerator|Top Loading Incinerator)
 
2. Auto Roll Air Filter for Clean Room

450x210x300cm

 


What is medical waste management


Item

Specification

Model

YD-20C

Main Product List

 

Primary Combustion Chamber

Secondary Combustion Chamber

Mix-Combustion Chamber

Smoke Filter Chamber

Incinerator Control Case

Chimney:5.0Meters *(upgrade to Stainless Steel, free Price )

Italy oil burner: 02 sets

Oil Tank: 100Liters

 

Optional:


Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Mobile Trailer for Incinerator

Nanjing Clover Medical Technology Co.,Ltd.
bio medical waste management ppt 2020

HICLOVER Incinerator/Parts Range

Main Feature

Medical Waste Incinerators

HICLOVER 10-500kgs/Hr.Double Combustion Chambers

Single Combustion Chamber

Small, Cheap,10-20kgs/Hr.

Three Combustion Chambers(Optional)

3 Chambers for high risk waste

Pet Cremation Equipment

For Pet(small/big) Cremation Business

Animal Incineration Equipment

The secondary chamber must comply with the following minimum criteria:
“• Heavy steel construction
• An excess air and high temperature operational mode.
• Sufficient size and appropriate geometry to achieve a gas temperature of at least 1000 Celsius for a retention time of at least 2 seconds when pre-heated and correctly operated.
• Sufficient forced air inflow and airflow and fuel supply controls to ensure an exhaust gas oxygen content range of 6-12% at all times. 
• Hot face refractory concrete-ceramic suitable for thermal shock up to 1400 Celsius and abrasion. Minimum thickness 150mm. 
• Cold face refractory lining of calcium silicate or superior material, minimum thickness 100mm. 
• Refractory lining of all the ducts shall be done with refractory castings. Superior quality ceramic wool shall be used at all hot duct flanges and expansion joints
• An electrically powered fan forced air supply, with the capacity for variation by the operator.
• One or more fuel burners designed to use diesel fuel type 2 (vehicle standard) equipped with a spark igniter.  
• A digital thermometer with connected to an electronic datalogger. The thermometer shall be located on the chamber wall away from the fuel burner.

For other animal incineration


Items/Model

TS100(PLC)

TS150(PLC)

TS300(PLC)

TS500(PLC)

Burn Speed (Typical )

100 kg/hour

150 kg/hour

300 kg/hour

500 kg/hour

Control Mode

PLC Auto.

PLC Auto.

Combustion Chamber

1200L

1500L

2000L

3000L

Internal Dimensions

120x100x100cm

150x100x100cm

170x120x100cm

210x120x120cm

Secondary Chamber

600L

750L

1000L

1500L

Smoke Filter Chamber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Feed Mode

Manual

Manual

Manual

Manual

Voltage

220V

220V

220V

220V

Power

1.38Kw

1.69Kw

2.57Kw

4.88Kw

Diesel Oil Consumption (kg/hour)

Ave.20.4

Ave.24.2

Ave.33

Ave.44

Natural Gas Consumption (m3n/hour)

Ave.24.5

Ave.29

Ave.39.6

Ave.52.8

Temperature Monitor

Yes

Yes

Yes

Yes

Temperature Protection

Yes

Yes

Yes

Yes

Oil Tank

200L

300L

500L

500L

Chimney

10Meter

10Meter

14Meter

14Meter

Chimney Type

Stainless Steel

Stainless Steel

Stainless Steel

Stainless Steel

1st. Chamber Temperature

800℃–1000℃

800℃–1000℃

800℃–1000℃

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

Residency Time

2.0 Sec.

2.0 Sec.

2.0 Sec.

2.0 Sec.

Gross Weight

6000kg

8500kg

11000kg

16000kg

External Dimensions

260x150x180cm

300x160x190cm

400x210x300cm

450x210x300cm




 CE Certification Pass

HICLOVER Solution for Fighting COVID-19 with CE Certification.
 
1. Medical Waste Incinerator(Containerized Mobile Incinerator|Top Loading Incinerator)
 
2. Auto Roll Air Filter for Clean Room

2021-02-21

 

2021-02-21


Medical waste Control pdf


The Incinerator units shall be designed to last in operation in a tropical environment for a minimum period of 10 years if the specified maintenance schedule is followed. All metal surfaces (except combustion chamber internal fittings) shall be either galvanized, enameled, painted or otherwise treated against atmospheric and process induced corrosion,Medical waste management pdf.
The incinerator combustion chamber(s) should be designed for easy maintenance of all internal parts including the refractory and insulation. Materials used in the individual parts of the incinerator shall be heat resistance and also be protected against oxidation, corrosion, etc.
The incinerator shell shall be made of mild steel with an adequate thickness for small units of between 3-6mm and larger units 5-10 mm depending on the construction part and painted externally with heat resistant aluminum paint suitable to withstand 250° C.  The outside surface temperature of the incinerator casing should not exceed 50° C above ambient temperature and shall include a safety mesh around all hot surfaces. Cold face refractory lining of calcium silicate or superior material, minimum thickness 100 mm.

Three Combustion Chambers(Optional)

3 Ranked for high risk waste

Pet Cremation Equipment

For Pet(small/big) Cremation Business

Animal Incineration Equipment

For other animal incineration

Items/Model

TS100(PLC)

TS150(PLC)

TS300(PLC)

TS500(PLC)


Burn Rate (Average)

100 kg/hour

150 kg/hour

300 kg/hour

500 kg/hour

Control Mode

PLC Auto.

PLC Auto.

PLC Auto.

Combustion Chamber

1200L

1500L

2000L

3000L

Internal Dimensions

120x100x100cm

150x100x100cm

170x120x100cm

210x120x120cm

Secondary Chamber

600L

750L

1000L

1500L

Smoke Filter Chamber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Feed Mode

Manual

Manual

Manual

Manual

Voltage

220V

220V

220V

220V

Power

1.38Kw

1.69Kw

2.57Kw

4.88Kw

Diesel Oil Consumption (kg/hour)

Ave.20.4

Ave.24.2

Ave.33

Ave.44

Natural Gas Consumption (m3n/hour)

Ave.24.5

Ave.29

Ave.39.6

Ave.52.8

Infection Monitor

Yes

Yes

Yes

Yes

Temperature Protection

Yes

Yes

Yes

Yes

Oil Tank

200L

300L

500L

500L

Chimney

10Meter

10Meter

14Meter

14Meter

Chimney Type

Stainless Steel

Stainless Steel

Stainless Steel

Stainless Steel

1st. Chamber Temperature

800℃–1000℃

800℃–1000℃

800℃–1000℃

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

Residency Time

2.0 Sec.

2.0 Sec.

2.0 Sec.

2.0 Sec.

Gross Weight

6000kg

8500kg

11000kg

16000kg

External Dimensions

260x150x180cm

300x160x190cm

400x210x300cm

450x210x300cm

2021-02-21

450x210x300cm


All incinerators shall meet the following emission and operating standards:
• Combustion efficiency (C.E.) shall be at least 99.0%
• The combustion efficiency shall be computed as follows:
o C.E = (CO2 X 100) / (%CO2 +%CO)
Suitably designed pollution control devices such as scrubbers, filters or electrostatic precipitators, shall be installed/retrofitted with the incinerator to achieve emission limits.”
“Each unit shall include a complete vertical exhaust and stack system, including the following features:
• Steel construction.
• Refractory lining in the lower section.
• The exit height of the stack shall be not less than a range of 3-12 metres above ground level depending on the capacity of the incinerator unit. 
• The diameter of the stack shall be selected by the Contractor to deliver an exhaust exit velocity of not less than 10 metres per second vertically upwards when at full scale operation.
• An emission stack sampling port shall be included immediately above the secondary chamber.
 CE Certification Pass

HICLOVER Solution for Fighting COVID-19 with CE Certification.
 
1. Medical Waste Incinerator(Containerized Mobile Incinerator|Top Loading Incinerator)
 
2. Auto Roll Air Filter for Clean Room

 

2021-02-21