Another challenge: disposing of waste


A single Ebola patient treated in a U.S. hospital will generate eight 55-gallon barrels of medical waste each day.

Protective gloves, gowns, masks and booties are donned and doffed by all who approach the patient’s bedside and then discarded. Disposable medical instruments, packaging, bed linens, cups, plates, tissues, towels, pillowcases and anything that is used to clean up after the patient must be thrown away.

Even curtains, privacy screens and mattresses eventually must be treated as contaminated medical waste and disposed of.

Dealing with this collection of pathogen-filled debris without triggering new infections is a legal and logistical challenge for every U.S. hospital now preparing for a potential visit by the virus.

In California and other states, it is an even worse waste-management nightmare.

While the U.S. Centers for Disease Control and Prevention recommends autoclaving (a form of sterilizing) or incinerating the waste as a surefire means of destroying the microbes, burning infected waste is effectively prohibited in California, and banned in several other states.

“Storage, transportation and disposal of this waste will be a major problem,” California Hospital Association President C. Duane Dauner warned Sen. Barbara Boxer, D-Calif., in a letter last week.

Even some states that normally permit incineration are throwing up barriers to Ebola waste.

In Missouri, the state attorney general has sought to bar Ebola-contaminated debris from a St. Louis incinerator operated by Stericycle Inc., the nation’s largest medical waste disposal company.

Due to restrictions on burning, California hospital representatives say their only option appears to be trucking the waste over public highways and incinerating it in another state — a prospect that makes some environmental advocates uneasy.

Rules for transport

Under federal transportation guidelines, the material would be designated a Class A infectious substance, or one that is capable of causing death or permanent disability, and would require special approval from the Department of Transportation, hospital representatives say.

“These are some pretty big issues and they need some quick attention,” said Jennifer Bayer, spokeswoman for the Hospital Association of Southern California.

“We fully expect that it’s coming our way,” Bayer said of the virus. “Not to create any sort of scare, but just given the makeup of our population and the hub that we are. It’s very likely.”

The Ebola virus is essentially a string of genetic material wrapped in a protein jacket. It cannot survive a 1,500-degree scorching within an incinerator, or the prolonged, pressurized steam of an autoclave.

“The Ebola virus itself is not particularly hardy,” CDC Director Dr. Thomas Frieden said under questioning on Capitol Hill recently. “It’s killed by bleach, by autoclaving, by a variety of chemicals.”

However, CDC guidelines note that “chemical inactivation” has yet to be standardized and could trigger worker safety regulations.

Getting ready

California health officials recently tried to reassure residents that the state’s private and public hospitals were up to the task and were actively training for the possible arrival of Ebola.

“Ebola does not pose a significant public health risk to California communities at the present time,” said Dr. Gil Chavez, an epidemiologist and deputy director at the California Department of Public Health. “Let me tell you why: Current scientific evidence specifies that people cannot get Ebola through the air, food or water. … The Ebola virus does not survive more than a few hours on impervious surfaces.”

It was unclear whether California officials viewed the waste issue as a potential problem.

Although one-third of the state’s private hospitals and “a few” of its public hospitals reported to Boxer’s office that there would be problems complying with the CDC’s incineration recommendation, and others, a state public health official told reporters he was not aware of any conflicts.

Dr. David Perrott, chief medical officer for the California Hospital Association, said there was also confusion about whether infected human waste could be flushed down the toilet.

“Here’s what we’ve heard from the CDC: It’s OK,” Perrott said. “But then we’ve heard from some sources, that maybe we need to sterilize it somehow and then flush it down the toilet or you have to check with local authorities. It sounds maybe a little gross, but there is a real question about what to do with that waste.”

Overreaction?

Dr. Thomas Ksiazek, a professor of microbiology and immunology of the University of Texas Medical Branch, has said he believes there’s been a lot of overreaction about Ebola medical waste.

“There are other ways to deal with the waste; autoclaving would be chief among them,” Ksiazek said. “The problem is, most hospitals don’t use it for most disposable items. They’re quite happy to bag them up and send them to a regular medical disposal company.”

But Allen Hershkowitz, a senior scientist at the Natural Resources Defense Council, said incineration is simple and effective, and should be available to hospitals to help dispose of the mountain of waste.

Hershkowitz said states began to crack down on medical waste incineration years ago because materials that didn’t need to be burned were being sent to combustors and were emitting dangerous pollutants.

In this case of Ebola medical waste, he said California should reconsider its restrictions.

“There’s no pollutant that’s going to come out of a waste incinerator that’s more dangerous than the Ebola virus,” Hershkowitz said. “When you’re dealing with pathogenic and biological hazards, sometimes the safest thing to do is combustion.”

by: http://www.sfgate.com/news/article/Another-challenge-disposing-of-waste-5909413.php


Medical Waste Incineration Model TS20(PLC) Wet Scrubber (Water Spary tower)


Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Nanjing Clover Medical Technology Co.,Ltd.

Items/Model

TS20(PLC)

Picture

 

Principle

Medical Waste Incineration 

Burn Rate

Average 20 kg/hour

Feed Capacity

Average 40kg/feeding

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

210L

Internal Dimensions

65x65x50cm

Secondary Chamber

110L

Smoke Filter

Wet Scrubber (Water Spary tower)

Feed Mode

Manual

Voltage

380V

Power

5Kw

Oil Infection (kg/hour)

7.8–16.3

Gas Consumption (m3/hour)

8–15.7

Infection Monitor

Digital Screen

Temperature Protection

Yes

Oil Tank

100L

Feed Door

45x40cm

Chimney

5Meter

Chimney Sort

Stainless Steel

1st.

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

Residency Time

2.0 Sec.

Gross Weight

4000kg

External Dimensions





HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator

160x110x130cm(Incinerator)

 


Incinerator burn medical and bio waste


Incinerator burn medical and bio waste

Items/Model

TS100(PLC)

Picture

 

Principle

Medical  Waste Incineration Treatment

Burn Rate

Average 100 kg/hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

1200L

Internal Dimensions

120x100x100cm

Secondary Chamber

600L

Smoke Filter Chamber

Yes(Dry Scrubber)

Feed Mode

Manual

Voltage

220V/380V

Power

0.7Kw

Oil Infection (kg/hour)

average 20.4

Gas Consumption (m3/hour)

***

Temperature Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

200L

Feed Door

80x60cm

Chimney

10Meter

Chimney Sort

Stainless Steel

1st.

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

Residency Time

2.0 Sec.

Gross Weight

6000kg

External Dimensions

260x150x180cm

HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Nanjing Clover Medical Technology Co.,Ltd.


 


negozio tiffany milano the whole of Europe has 423 waste incinerators


Among them,tn, the steel industry produced two? English number is much higher than normal number of waste incineration. � stone hillsIncineration plant turned landscapeIn recent years, with advances in technology, incineration, waste incineration plants living abroad to implement a large-scale restructuring, through higher environmental standards to transform the old incinerator, off a small plant, built manufacturers make incineration plants to scale,veste barbour homme, large-scale development.According to statistics,outlet hogan, in 2010, there are 35 countries and regions have built more than 2,barbour femme,000 lives incineration plant,air jordan 4 retro rouge noir, mainly in Europe,barbour international, the United States, Japan and other developed countries and regions. Interestingly, many of the incineration plant is not only a waste disposal facilities, but also because of new and unique designs, a local landmark, has become a beautiful landscape.As of the end of 2009, the Japanese waste incineration rate has reached 79.8%; the whole of Europe has 423 waste incinerators, burning about 0.25 kg per capita / day; Germany, Canada and other countries, to be buried in the ground for decades to re-dig the garbage incineration power generation; the United States a total of 220 units of existing incinerator, the total size of 93,943 tons / day waste incineration capacity is 2 times China over the same period.2010 statistics.

the very fact that what is happening behind the let unexpected. This gentleman seems to sit down, “restless”, not only accounts for part of the very fact that the position, but after the car has been in his legs from side to side, occasionally touch the very fact that the legs on her husband to send in information Ms. Zhang said, “this man next to me,abercrombie paris, half of my fork legs to the seat.” The very fact that the husband is very angrily to the very fact that the reply “What?” “Be careful purse, had sent me JIAJIANG information,abercrombie paris, I’ll pick you up. “” behind the vacancy,abercrombie, then another location “and other information. However.

there are 35 countries worldwide and has more than 2,barbour paris,000 regional solid waste incineration plants, mainly in Europe, the United States, Japan and other developed countries and regions,giuseppe zanotti pas cher, and 70-90% of household waste are incinerated deal with.Beijing News reporter Rao Pei edition have writtenInformation provided / Beijing Municipal Administration Commission(Original title: end of next year Beijing will be 23,000 tons of waste pr”Popping”,abercrombie paris, a loud slap startled passengers in the car, with a surprised look, we have looked toward the source of the sound, and saw a young woman standing on the seat face angrily, sitting next to her of a man then burst into his mouth and shouted, “hey, you do not misunderstand!” “I do not tell you to say, we went to the police station, your hair almost white people how to draw this also stem thing? “the young lady angry riposte.Approximately at 17:00 on the 10th, two from the Shaw Dam tour bus stop, directly to the Shaw Dam police station. In the police station, the young lady told reporters about what was going on.Ms. Zhang is Leshan, some time ago because of the things the company was sent to Chengdu meeting. At 14:00 on the 10th, the very fact that the new South Gate Station from Chengdu, Leshan back car ready (microblogging),nike tn soldes, to board the bus after a place to sit near the window, a man got into it, in a patrol car After the circle sat down next to Ms. Zhang’s. “He sat down and put my seat back also accounted for one-third, and the legs Zhang very open, I think I also relatively thin, give him a little nothing.” Miss Yu Shizhang Wanglibian squeezed,giuseppe zanotti, pulled out his cellphone and her husband and friends.However.

since the people in the car were full,moncler pas cher, so for the position is not very convenient, a little woman man style Ms. Zhang said:. “Aging mother to see him do tricks wisdom, you incomes for tax, I pretended to sleep.”After about 20 minutes the bus departure, the man began to intensify,tiffany outlet online, but the very fact that all this is seen in the eyes. “He put his black bag on your lap, and then the following outstretched hand from the bag and began to touch just about to take it back,parajumpers homme, to test a few times after the beginning of touch.

by: http://voipshoip.com/negozio-tiffany-milano-the-whole-of-europe-has-423-waste-incinerators/


The cost of a small incinerator



Medical Waste Incinerator Capacity: Typical 50-100 kgs Each hour

Items/Model

TS50(PLC)

Picture

 

Principle

Medical Waste Incineration 

Burn Rate

Average 50-100 kg/hour

Feed Capacity

Average 100kg/feeding

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

560L

Internal Dimensions

100x80x70cm

Secondary Chamber

280L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Power

0.7Kw

Oil Infection (kg/hour)

Typical 16.9

Gas Consumption (m3/hour)

Typical 20.2

Infection Monitor

Digital Screen

Temperature Protection

Yes

Oil Tank

100L

Feed Door

70x55cm

Chimney

5Meter

Chimney Type

Stainless Steel

1st.

Gross Weight

4500kg

External Dimensions

230x130x155cm

Optional Part: Stainless Steel Wet scrubber

HICLOVER Incinerator/Parts Range


Main Feature

Medical Waste Incinerators


Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

HICLOVER 10-500kgs/Hr.Double Combustion Chambers

Nanjing Clover Medical Technology Co.,Ltd.

Single Combustion Chamber

Small, Cheap,10-20kgs/Hr.

Three Combustion Chambers(Optional)

3 Chambers for high risk waste

Pet Cremation Equipment

For Pet(small/big) Cremation Business

Animal Incineration Equipment

For other creature incineration

Items/Model

TS100(PLC)

TS150(PLC)

TS300(PLC)


TS500(PLC)

Burn Speed (Average)

100 kg/hour

150 kg/hour

300 kg/hour

500 kg/hour

Control Mode

PLC Auto.

PLC Auto.

PLC Auto.

PLC Auto.

Combustion Chamber

1200L

1500L

2000L

3000L

Internal Dimensions

120x100x100cm

150x100x100cm

170x120x100cm

210x120x120cm

Secondary Chamber

600L

750L

1000L

1500L

Smoke Filter Chamber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Feed Mode

Manual

Manual

Manual

Manual

Voltage

220V

220V

220V

220V

Power

1.38Kw

1.69Kw

2.57Kw

4.88Kw

Diesel Oil Consumption (kg/hour)

Ave.20.4

Ave.24.2

Ave.33

Ave.44

Natural Gas Consumption (m3n/hour)

Ave.24.5

Ave.29

Ave.39.6

Ave.52.8

Infection Monitor

Yes

Yes

Yes

Yes

Temperature Protection

Yes

Yes

Yes

Yes

Oil Tank

200L

300L

500L

500L

Chimney

10Meter

10Meter

14Meter

14Meter

Chimney Type

Stainless Steel

Stainless Steel

Stainless Steel

Stainless Steel

1st. Chamber Temperature

800℃–1000℃

800℃–1000℃

800℃–1000℃

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

Residency Time

2.0 Sec.

2.0 Sec.

2.0 Sec.

2.0 Sec.

Gross Weight

6000kg

8500kg

11000kg

16000kg

External Dimensions

260x150x180cm

300x160x190cm

400x210x300cm

450x210x300cm



Sudan Kassala state and we are working on installing an incinerator for Girba hospital in Girba locality.
 CE Certification Pass

HICLOVER Solution for Fighting COVID-19 with CE Certification.
 
1. Medical Waste Incinerator(Containerized Mobile Incinerator|Top Loading Incinerator)
 
2. Auto Roll Air Filter for Clean Room

2020-10-28

 

2020-10-28


About Hiclover Medical Enviromental



The pet cremation equipment humanized design with movable platform, little space covers for modern pet cremation business owner all over the world.

HICLOVER, Nanjing Clover Medical Technology Co.,Ltd, provide system alternatives for medical environmental protection, animal and pet cremation technology, other municipal solid waste incineration project.


System solutions for medical waste environmental, such as waste incineration, smoke cessation treatment, high-temperature sterilization, ultraviolet sterilization lamp, waste shredder, needle destroyer, medical waste package, sharp containers.


The containerized portable incinerator mounted in ISO container before leave mill, pre-installation, no incineration house build construction, movable by dust and truck lamp sterilization inside.


Biomedical waste management ppt


Items/Model

TS50(PLC)

Picture

Principle

Medical Waste Incineration,Double chamber incinerator

Burn Rate

50-100 kg/hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Combustion Chamber

560L

Internal Dimensions

100x80x70cm

Secondary Chamber

280L

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V

Electricity

0.7Kw

Oil Infection (kg/hour)

Typical 16.9

Gas Consumption (m3/hour)

Typical 20.2

Infection Monitor

Digital Display

Temperature Protection

Yes

Oil Tank

100L

Feed Door

70x55cm

Chimney

5Meter

Chimney Sort

Steel

1st.

800℃–1000℃

2nd.

Three Combustion Chambers(Optional)

3 Ranked for high risk waste

Pet Cremation Equipment

For Pet(small/big) Cremation Business

Animal Incineration Equipment

For other creature incineration

Phone: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Nanjing Clover Medical Technology Co.,Ltd.

Items/Model

TS100(PLC)

TS150(PLC)

TS300(PLC)

TS500(PLC)

Burn Rate (Typical )

100 kg/hour

150 kg/hour

300 kg/hour

500 kg/hour

Control Mode

PLC Auto.

PLC Auto.


PLC Auto.

PLC Auto.

Combustion Chamber

1200L

1500L

2000L

3000L

Internal Dimensions

120x100x100cm

150x100x100cm

170x120x100cm

210x120x120cm

Secondary Chamber

600L

750L

1000L

1500L

Smoke Filter Chamber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Feed Mode

Manual

Manual

Manual

Manual

Voltage

220V

220V

220V

220V

Electricity

1.38Kw

1.69Kw

2.57Kw

4.88Kw

Diesel Oil Consumption (kg/hour)

Ave.20.4

Ave.24.2

Ave.33

Ave.44

Natural Gas Consumption (m3n/hour)

Ave.24.5

Ave.29

Ave.39.6

Ave.52.8

Infection Monitor

Yes

Yes

Yes

Yes

Temperature Protection

Yes

Yes

Yes

Yes

Oil Tank

200L

300L

500L

500L

Chimney

10Meter

10Meter

14Meter

14Meter

Chimney Type

Stainless Steel

Stainless Steel

Stainless Steel

Stainless Steel

1st. Chamber Temperature

800℃–1000℃

800℃–1000℃

800℃–1000℃

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

Residency Time

2.0 Sec.

2.0 Sec.

2.0 Sec.

2.0 Sec.

Gross Weight

6000kg

8500kg

11000kg

16000kg

External Dimensions

260x150x180cm

300x160x190cm

400x210x300cm

450x210x300cm

No

Description

Specification

 

1

Sort

Double Chamber (Primary + Secondary Type Controlled Air Pyro Lytic Biomedical Waste Incinerator with Chimney Arrangement

yes

Two

Incineration Capacity

>50 Kg. Per hour

Yes, 50-100kgs/hour

3


Duration of Use

According to operational requirements

Typical 10years

4

quantity of Chambers

02 No.s

yes

Number of Burners each Chamber

01 No.s

yes

5

Total burners per incinerator

02 No.s

yes

6

Primary Chamber Operation Temperature

Max. 900 Degree Celsius

800-1000 Degree Celsius

7

Secondary TemperatureOperation Temperature

Max. 1075 Degree Celsius

1000-1200 Degree Celsius

Design Temperature for both chambers

Max. 1500 Degree Celsius

1750 Degree Celsius

8

Incinerator Efficiency

98-99 %

yes

9

Refractory Materials

High Alumina Refractory

High Alumina Refractory and firebrick

10

Refractory Sort

Castable kind

yes

11

Ash Removal

Manual Removal Drawer Tray

yes

12

Material of Construction of Chamber

IS 2062

Q235, like IS2062

13

Form of Burner Used

Completely Automated Electrically operated burner together with Head with photo cell for flame supervision Nozzle and Electrode

yes

Link hoses, Ignitor, Pump Fan & Cabling System

yes

14

Qty.

01 No.

 

15

Power

230 / 440 V According to availability at end user

220-240V

16

Electrical Cabling

Within battery limitations

Standard 3Meter

17

Refractory

 

18

Sort

Castable Sort

yes

19

Anchor Fasteners

AISI 316

Firebrick made,none anchors. S.S fiber 446

20

Coating on Anchors

Parafin

not one

21

Alumina Percentage

40-60 %

Above 60%

22

Density

2.1 g/Cubic cm

3-3.5 g/Cubic cm

23

Service Temperature Max.

1500 Deg. Celsius

1750 Deg. Celsius

 

Insulating Castable

 

24

Sort

Castable

High alumina ceramic fiber Insulation

25

CCS at 110 Grade

35-45 Kg /Sq.. Cm.

Not one parameter

26

Grain Size

5 Millimeter

Not one parameter

27

Density

1.2 gm / cm3

220kg/m3

28

Service Temperature

1350 Degree C

1260 Degree C

 

Control Panel

 

29

Degree of Ingress Protection

IP 55

yes

30

Tool MOC

SS 304

yes

31

Tool

Cabinet with Observation Glass and PLC Programmer

yes

32

Chimney

 

33

MOC

IS 2062

yes

34

Height

According to necessity

5 meter

3536

Total Space RequirementCompleted with Civil and Electrical

Maximum 5 Mtr. X Mtr. Work

yes

2021-02-23

34

Height

As per requirement

5 meter

35
36

Total Space Requirement
Completed with all Civil and Electrical

Maximum 5 Mtr. X 5 Mtr. Work

yes


 CE Certification Pass

HICLOVER Solution for Fighting COVID-19 with CE Certification.
 
1. Medical Waste Incinerator(Containerized Mobile Incinerator|Top Loading Incinerator)
 
2. Auto Roll Air Filter for Clean Room

 

2021-02-23


waste incinerator manufacturer china


waste incinerator manufacturer china

The incinerator burn waste in primary combustion chamber and burn the smoke from primary combustion chamber again to make sure environmentally friendly with no black smoke, smelless, reduce pathogenic bacteria infection.
System solutions for medical waste environmental, including waste incineration, smoke emission treatment, high-temperature sterilization, ultraviolet sterilization lamp, waste shredder, needle destroyer, medical waste package, sharp containers, etc.