Burn Rate * 60 Kg / hr
Ingredients to be burned Cotton, Rubber, PVC Sheets, PE Gloves, Oil, Plastic Bottles, Paper etc.
Chambers * Dual Chamber.
1: Primary Controlled Air
2: Secondary Excess Air
Temperature Monitoring Required
Temperature Control to Primary & Secondary Chambers Required
System Status & Alarms Required for all necessary parameters.
Fittings & Accessories Complete Package is required ( Including Nozzles & Flanges etc.)
Installation Requirements. As low as possible . Almost Plug & Play type.
Dimensional Sketch, Operation & Installation Manuals. Required
Off – Gas System Required
Heat Insulation Required for indoor installation
Delivery Karachi Sea Port – Pakistan
The details of Components of incinerator is as follows:
Component Name Features Range.
Primary Chamber Temperature Required* 800 – 1000 deg C.
Heating Source Natural Gas
Secondary Chamber Temperature * 1100 – 1300 deg. C
Heating Source Natural Gas + Propane or Fuel Oil as an additional source
Off – Gas Residence Time 2 Seconds.
Refractory Material Material * Alumina ( 56 – 80 % Pure )
Lining * SS 316L
Life Span * 10 – 15 years.
Rating Temperature 1600 – 1800 deg. C
Media Slightly acidic
Insulation Material Ceramic Fiber
Thickness 25 “ minimum
Feeding & Ash Removing System Air Tight ventilating locked doors ( Feeding from Top will be preferred)
Spares Required for 5 Years trouble free operation