Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Animal waste incinerator

Incinerator type: Animal waste incinerator
Load Capacity minimum:  1500 kg
Burner fuel type:  Diesel
Burner fuel rate max.:   20-25 Liter diesel/ per hour
Burners minimum: 3
Burning rate minimum: 200-300kg/per hour
Furnace bar area minimum: 2 м3
Fuel tank capacity minimum: 300L
Main chamber burning temperature min. 1100 0C
Afterburner chamber burning temperature min.  1300 0C
Power supply 220V
Incinerator items and electrical appliances should be weather proof and humidity resistant within the range of 30-90 %
Incinerator should be compliant to the environmental protection rules in accordance to national legislation
Maximum dimensions – Length – 5m, width – 3.5m, height – 5m

china animal incinerator, buy a pet incinerator,

Smart Ash Incinerators

Smart Ash Incinerators

1. Size requirement for the incinerators is that the unit works with a 55 gallon open ended
steel drum.
2. The unit should operate wit. no fuel and use only 120V or 220V electricity for the blowers.
3. The unit should be capable of burning oil contaminated wastes and medical wastes with a moisture content of 0-15%J
4. Each unit should come witH two steel drums, so that a spare drum is available.

Spare Parts Option
If there are any vendor suggested spare parts , that list and price should be included as an option in the offer.

200 BEDS HOSPITAL INCENERATOR TECHNICAL INFORMATIONS

1) Policy

– Waste disposal management shall be taken special note to prevent hospital infection.

– Infections wastes shall be managed, stored strictly and burned by a incinerator located at hospital site.

 

2) Waste Disposal Plan

a) Classification

– Medical wastes in hospital are classified as follows;

 

Infections Waste

Specially-controlled waste

Organ, needle, etc.

Industrial waste

Rubber gloves, etc.

General waste

Gauze, etc.

General Waste

Plastic, Rubber

Infusion bottle, etc.

Paper, wood, Vinyl

Voucher, etc.

Metal, Glass

Can, Glass bottle

 

b) Infections Waste Disposal

– Segregation: Infections waste disposal shall be segregated appropriately and packed in particular containers and delivered to particular storage. The segregation, packing and delivery shall be operated appropriately at each room such as outpatient, operation theater, blood collection room and dialysis room.

– Precaution: Infections waste shall not be place in other containers on the way of segregation, packing and delivery.

– Storage: Infections waste shall be stored at the storage in hospital site temporarily until infections waste is incinerated.

– Incinerator:

 

It is designed to sterilize medical waste , reduce its volume , and render its components unrecognizable all in one fully enclosed and automated system.

It combines direct heated steam , high pressure and shredding to treat infectious materials.

The contaminated waste is loaded into the upper stainless steel chamber where a heavy-duty shredder reduces the waste into small pieces. Using gravity, the processed material falls into the treatment chamber where every piece is steam heated to 134 and pressurized to 3 to bar for 20 minutes. The operating conditions are continuously monitored and validated to achieve complete sterilization.

The 60 minutes average duration process cycle is totally automated. A computerized system monitors the process and automatically prints a report with the essential sterilizing parameters at the end of the cycle for accurate record keeping.

The capacity is between 500 to 600 kg/cy.h or more.

Treatment cycle:

1- Loading ; the contaminated waste is automatically -loaded into the chamber of the unit

2-Shredding; the heavy-duty shredder cut the material into small pieces and features a unique reversing system to avoid jamming

3-Heat; saturated pressurized steam raises the temperature to 134 C and the pressure to 3 bar

4-Sterilization; the sterilization comes into direct contact with the shredding material (134 c , 3 bar) for 20 minutes

5-Cooling; temperature is lowered to 80 C by spraying cool water onto Double jacket of the treatment vessel, simultaneously, the unit returns to ambient pressure

6-Draining; the steam is condensed to water and discharged with the cooling water to the sanitary sewer system

7-vacuum; the remaining residual steam is vented out through a vacuum pump

8-Unloading; a digital signal informs the operator that all safe operating conditions have been met

The condition unlocks the unit and allows gravity unloading of the treated waste into a container

Teaching Specification

General Characteristics

Operational temp. max

160 C

Max Weight when filld with waste For a special hydraulic test. Kg

10500

Stress. Kg/ cm3

3.5

Steam Pressure. Bar

8

Max Steam Flow Kg/h

500

Compressed Air Bar

6

Electricity 380 V/3 – phase Surge Protection system

35KW

Operating Characteristics

Average Cycle Time. minutes

60

Process Wight Capacity . Kg

500 – 600

Density. Kg/m3

100

Average process wight capacity Kg./cycle microbial inactivation

200-300

8log 10

Waste volume reductin

80%

Consumption / Cycle

Steam. Kg

40

Electricity . KW/h

9

Water Liters

500

 

Volcano can become garbage incinerator it?

The idea is good . There toss volcano every day, it appears to be an ideal natural elimination of garbage incinerator. However, I know you want to, but that there is kind of the center of the crater lake of lava lovely. Like some of the shield volcano in Hawaii, they will spray lava slowly to the ground, burning garbage seems very appropriate.

But in fact most of the volcanoes on Earth is called stratovolcanoes, they occasionally have lava flows, but once the heat is too high inside the volcano, the lava “exploding”, but said that the explosion on the explosion. Take one of the Kilauea volcano, the 20th century it erupted 45 times, still often eruption (Figures are it erupted April 23, 2015 in, HVO / USGS). If you’re close to bring garbage thrown into lava, volcanic ash in the distance, just a splash of lava and toxic gases can make you die of.
We want to deal with waste is not insignificant. Said generation American, four pounds per person per day and a half of garbage a year is 250 million tons. If we want to deal with volcanic waste, we need to first lock on the appropriate active volcano, put the garbage there. Few people live near an active volcano, delivered to the garbage will spend a lot of time, money and fuel. You always have to worry about people throwing trash or garbage truck safety.
You have to know that when touched to a large number of normal garbage magma may explode instantly. In 2002, researchers in Ethiopia will be a 30-kilogram bag of garbage thrown into the crater, the result was shocking to see the spectacular explosion. And that package is only equivalent to the United States four garbage home half of the week garbage “yield.” Scientists also observed scene rockfall fall when the lava lake in Hawaii, lava spilled 85 meters of altitude, lava splashing into distant fence and scientific network cameras. So go down garbage, a little too risky.
Not to mention that all the gas you when burning garbage in the volcano, the generated directly into the atmosphere, resulting in a lot of air pollution. And today’s formal regulatory incinerator has systems to ensure that garbage incineration smoke treated before entering the atmosphere. System to prevent the spread of major pollutants is ozone, carbon monoxide and sulfur dioxide.
Human civilization can not be manufactured pieces of debris are thrown into the volcano, there is another reason. That some of the more specialized waste, such as medical waste or nuclear waste, they tend to be particularly dangerous thing. The volcanic lava in a temperature of approximately 700 to 1250 degrees Celsius, which is of course very hot, but the temperature is not enough.
So, with volcanoes act as a garbage incinerator is probably slightly wrong. But still this sentence: a good idea. Please continue to think, to act as a viable method envisaged transfer of volcanic waste incinerator.QQ图片20151223143317

Clover's Social Media