Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
WASTE INCINERATOR
INCINERATOR (WASTE INCINERATOR)
Designed to burn disposables that can and should be destroyed on-site. Theses wastes include infectious and contaminated “red bag.” Surgical dressings, plastic test devices and other wastes
Fast, complete, efficient waste disposal
Dual chamber combustion, Chambers insulated and lined with high temperature refractory. Programmable digital temperature controls, temperature indicators and charge recorder. Modulating control for fuel and air lowers fuel consumption.
Minimum installation and start up time
Aluminized steel jacket lined with refractory and firebrick. Monitors recorders and other accessory equipment should be available.
Charging system:
- Vertical charge door on primary chamber.
- Pneumatic or hydraulic ram charging system.
- Auto shut down of the door after charging.
- Primary and secondary chamber temperature displayed and recorded (optional)
Charging rate:
- Up to 100kgs per hour of waste or red bag waste rated at 2200 BTU’s per kg.
Fuel:- Natural Gas
Capacity (Cubic Mtr): 1.65M3 or more
Ave Capacity: 100kg per hour
Secondary Chamber Capacity (CubicMtr) :3.88 or more
Length (mm): 1880 or better
Width (mm): 1280 or better
Height Incl. Flue (mm): 7700 or better
Ash Door Opening (mm): 475×900 or better
Min. Operating temperature: 90 degree centigrade
Max, Operating Temperature: 1350 degree centigrade
Residency time in Second Chamber: 2 sec
Temperature Monitoring: Both for primary and secondary chambers.
Loading SystemManual/semi-automatic
Waste destruction efficiency:> 90% by weight
Filter: Ceramic or other equivalent filters in order to reduce the induction of hazardous air pollutants, particulates, co,dioxin/furane into the atmosphere.
De ashing system: Manual/semi-automatic.
The System must be quoted complete with:-
- Plumbing
- Electrical panels
- Civil works
- Waste collection Trolleys
Finish/ Paint:-
High Quality heat resistant, two layers high-grade epoxy Paint coating.
Installed Power (Electric Voltage): 440V/ 50 Hz
Waste Management Equipment must have ;
Mobile loading trolley: 06 No’s – For transportation of hospital waste from wards to incinerator site/ room, Opening from the top.
WASTE BINS MOBILE: 06 No’s-Made of Plastic, in blue color with a cover flap.
Plastic Bags: 2000 no’s each in Red and Yellow color.
Heavy Duty Gloves Pairs: For Waste handling staff-06 Pairs
Long Shoes Pairs: For waste handling – 06 Pairs.
Make: UK, Europe, USA, Japan
Chamber Double Incinerator
Chamber Double Incinerator:
Burning Rate 10 kg per hour (for two incinerators)
Burning Rate 20 kg per hour (for three incinerators)
Loading Method Manual
No of Burners Single for 10 kg/hour and Double for 20 kg per hour
Fuel Diesel and Natural Gas
Warm Up Time Not more than 20 minutes
Temperature controller Digital
Power Supply Single Phase 220V
Chimney Height 20 feet from ground level
Wet and Dry Scrubbers Optional
Gasified incineration for burning medical wastes
Gasified incineration for burning medical
wastes.
Fuel type: Natural Gas
Burning Capability:
– 30-50 kg/time
– Daily 3-6 times
Incinerator size: max 2000x1200x3200 mm
Burning room volume:
– Gasification room max 0.7 m3,
– Secondary burning room max 0.5 m3,
Size of the filling entrance: max 650×850 mm
Air blower: max 0,5 kW
Combustion-support combustion machines:
– Power max 0,2 kW
Re-burning machine: Power max 0,2 kW Voltage: 220V / 380V
Weight: max 5000 kg
User Manual Language: English
Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant.
Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant.
Requirements:
- Incinerator system complete with scrubber, pollution control system, water system, loading system, ash removing system and if anything more option is available. we have to burn 10000kgs/day, We work 8 hours a day, so your incinerator should have capacity to burn atleast 1400 or 1500kg/hr of waste.
supply 02 primary combustion chamber, and continuation feeding or alternately. each primary combustion volume is 4.0 M3, total 8 m3.
- With complete system specification, power, water fuel requirements.
- Space requirements & floor plan
- Pre-installation requirements. Space, power, water, drainage system etc
- Fuel type” diesel or gas?
- All options available.
- You have to send your technical team for installation, user training, maintenance training for end user technicians.
- Maintenance schedule—what has to be done, daily, weekly, quarterly, half yearly, annually.
- What are the replacement items during one year.
- Your system should meet all local & international standards with respect to handle of tobacco dust before feeding to incinerator, gas emission, waste water discharge to public drain system, ass disposal etc.
- End used will send this dust to incinerator plant in bags of 300kg each, so we are expecting 35 bags of 300kg each per day, 7 days a week.
- How many engineers or technicians you will send for installation, how many people, what machines & tools you want us to mobilize to facilitate your people to do the installation. how many days installation & training will take.
- What will be your charges for installation visit.
- If you have some picture of such big installations, references(within this region is helpful if you have), you can provide us.
Incinérateurs
Carburant Diesel
Capacité (M3) 1.92
Ave Capacity 1200kg
Consommation (litre/heure 12
Dimension externes
Longueur (mm) 3110
Largeur (mm) 2150
Hauteur (mm) 3200
Ouverture Porte 1000×2000
Dimension internes
Longueur (mm) 2200
Largeur (mm) 1050
Hauteur (mm) 800
Opération
Minimum température d’opération 950
Maximum température d’opération 1320
Température de suivi oui
Thermostat oui
Ventilateur oui
Chambre de combustion secondaire 2 secs
garantie minimum 12 mois