Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Biomedical Waste Incinerator, 10-15 KG 

Biomedical Waste Incinerator, 10-15 kg

Incinerator Introduction
Manufacturer:
Brand:
Type / Model:
Country of Origin:
Description of Function
The Biomedical Waste Incinerator is used for Incineration of each type of Biomedical Waste.
The Disposal of such Biomedical waste is a very important as it is a dangerous wastes for
human life, and It is only possible with a perfect incinerator.
Operational Requirements
It shall be operated by manual and automated mode.
The combustion efficiency (CE) shall be at least 99.00%.
The combustion efficiency is computed as follows:
C.E.= __%CO2______ x 100
%CO2 + %CO
Emission Standards: Lower emission rates are preferred.
Parameters                   Concentration in mg/Nm3 (12% CO2 correction
Max total dust              30mg/m3
Max Sulphur Dioxide      200mg/m3
Max Nitrogen dioxide    400mg/m3
Max Carbon                     100mg/m3
Monoxide
Minimum stack height shall be 30 metres above ground.
Volatile organic compounds in ash shall not be more than 0.01%.
System Configuration
Biomedical Waste Incinerator, complete unit.
Technical Specifications
Incinerator:
It shall be Electrical or Diesel Fired Incinerator or Controlled Air & pyrolytic.
Type of Waste: Biomedical Waste
It shall have burning capacity 10-15 kg/hr.
Fuel: Diesel
Burner: Monoblock fully automatic burners.
Temperature: Primary Chamber 800 ± 50 oC, Secondary Chamber 1050 ± 50 oC.
Type of Waste: Biomedical waste with moisture content up to 85%.
Destruction Efficiency: 99%.
It shall have separate digital display of temperature for both chambers.
It shall have provision for measuring primary & secondary chamber temperatures using external
thermo coupler.
Secondary chamber gas residence time shall be minimum 1 second at 1050 oC.
Primary Chamber:
Type: Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC
Insulation thickness: approx.115mm thick
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Ash Removal: Manual/automatic
Secondary Chamber:
Type : Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC.
Insulation thickness: approx.115mm
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Emergency Stack:
Type: cylindrical, top mounted on venturi ejector.
Material of Construction: Mild Steel, 3mm thick.
Refractory: 75mm thick castable.
Insulation: 25mm thick castable.
Quencher:
Material of construction of outer body: Mild Steel refractory lined from inside.
Shall have water circulation system with centrifugal pump.
It shall have to reduce flue gas temperature before venturi scrubber.
Shall provide pump motor of suitable capacity.
Air Pollution Control Device – Venturi Scrubber
Type: High pressure jet type.
MOC: Stainless steel – 316L.
Temperature at the outlet: 78-80 oC
Scrubbing Media: Water with 5% caustic
Re- Circulation Pump for Venturi Scrubber
Type: Centrifugal
Application: PP/SS
Piping : PPR
Droplet Separator & Re-Circulation Tank (Integral)
Type: Cyclonic
Application: To separate water droplets from flue gases
Material of Construction: Mild Steel Rubber lined 3mm thick
I.D. Fan:
Type: High pressure centrifugal
Material of Construction: Stainless steel 304, impeller and mild steel rubber lined casting
Drive: Bel
Combustion Fan:
Type: Centrifugal
Modulation: Manual damper control
Material of Construction: Mild Steel
Drive: Direct drive
Burners:
No. of burners: 2 Nos. (1 No. in Primary Chamber and 1No. in Secondary Chamber)
Type: Monoblock fully automatic
Fuel: Diesel
Fuel Oil Storage Tank:
Shall provide suitable capacity of oil storage tank.
Material of Construction: Mild steel.
Facility for visual checking of fuel shall be there.
It shall have diesel consumption monitoring system.
It shall come with diesel oil level indicator, piping with valves & N.R. valve.
Control Panel:
Type: Manual & Automated PLC based control panel with printer & recording device.
Material of Construction: CRCA sheet
It shall have digital temperature controller.
Epoxy powder coated washable paint finish.
It shall have audio-visual alarm system.
Chimney of 30 meters Height:
Material of Construction: Mild Steel
It shall be self-supporting type.
Height shall be 30 meters from ground level.
Paint The chimney is painted externally with two coats of heat resistant aluminum paint
Shall provide ladder till the top.
It shall have 3mm thick rubber lining from inside for protection.
It shall come with aviation lamp, lightening arrestor, stack, drain, inspection platform, sampling
port.
Consumption certificate:
The bidder must submit diesel consumption for a daily operation of 6 hours.
Turnkey:
Prices offered shall be inclusive of all civil works, electrical requirements including cabling and
switches required for installation & commissioning of the equipment.
Bidder shall submit detail drawings, design, and layout plan of civil works.
The bidder shall submit the details of BOQ of civil and electrical works.
Accessories, spares and consumables
All standard accessories, consumables and parts required to operate the equipment, including
all standard tools and cleaning and lubrication materials, to be included in the offer. Bidders
must specify the quantity of every item included in their offer (including items not specified
above).
Operating Environment
The system offered shall be designed to store and to operate normally under the conditions of
the purchaser’s country. The conditions include Power Supply, Climate, Temperature,
Humidity, etc.
Power supply: 220-240 VAC, 50Hz single phase/400 – 420 VAC, 50Hz three phase as
appropriate fitted with appropriate plug. The power cable must be at least 3 meter in length.
Standards and Safety Requirements
It shall have approval of “Pollution Control Board” of purchaser’s country.
All mandatory approvals required for the installation and operation of incinerator shall be done
by the bidder.
Must submit ISO 9001 AND
CE or USFDA approved product certificate.
User Training
Must provide user training (including how to use and maintain the equipment).
Warranty
Comprehensive warranty for 2 years after acceptance.
Maintenance Service during Warranty Period
During the warranty period supplier must ensure preventive maintenance along with
corrective/breakdown maintenance whenever required.
Installation and Commissioning
The bidder must arrange for the equipment to be installed and commissioned by certified or
qualified personnel; any prerequisites for installation to be communicated to the purchaser in
advance, in detail.
Documentation
User (Operating) manual in English.
Service (Technical / Maintenance) manual in English
List of important spare parts and accessories with their part number and costing.
Certificate of calibration and inspection from factory.

Waste Incinerators International Market Analytics

Key Word:

small incinerators

medical waste incinerator

pet animal cremation incinerator

incinerator manufacturers

 

 

Incinerator is a incineration equipment, direct fire waste by gas fuel or oi fuel. As different circumscription, incinerator can be named many words as below:

 

Treatment capacity: small scale incinerator, large scale incinerator and incineration pant.

Waste material: Municipal waste incinerator, medical waste incinerator, animal cremation incinerator, human cremators

Incinerator fuel: gas incinerator, oil incinerator

Waste to Energy (WTE): WTE incinerator, non-WTE incinerator

Incinerator Manufacturer: China incinerator manufacturer, UK incinerator manufacturer, USA incinerator manufacturer, India incinerator manufacturer.

Famous Incinerator manufacturer company: Inciner8(UK), Clover Incinerator(China), Pennram (USA) , Haat (India)

Burning Rate: 5kgs/hour, 10 kgs/hour, 15 kgs/hour, 20 kgs/hour, 30 kgs/hour, 50 kgs/hour, 100 kgs/hour, 150 kgs/hour, 300 kgs/hour, 500 kgs/hour

 

Pyrolytic incineration technical is traditional waste treatment way for many years. All over the world, in many countries, people anti incinerator because the incinerator will produce a large Dioxin in the smoke. “Dioxins” refers to a group of toxic chemical compounds that share certain chemical structures and biological characteristics.  Dioxins can be released into the environment through forest fires, backyard burning of trash, certain industrial activities, and residue from past commercial burning of waste.  Dioxins break down very slowly and past releases of dioxins from both man-made and natural sources still exist in the environment. Anyhow, we have to remind that, this is large scale incineration pant, generally more than 30 ton per day. This is a social problem, to analyze and suggest ways in different angles from the public, government, economic development, environmental protection, technology development, etc.

 

So, why we still use incinerator?

First, for the medical waste from hospital, the pyrolytic incinerators is best treatment up to now. Pyrolytic technology can kill the virus, pollution control.

Second, for human body, pet animal, in many countries and regions, we desire to cremation them. This is the ceremony in the process of society development, and ceremonies to commemorate the disappearance of life.

 

As above two reason but not only above, we still use incinerators.

 

How you can find reasonable incinerator for your local site?

Incinerator is not a cheap equipment, generally the small scale model’s price around $5,000usd per unit and large scale model’s price more than $50,000usd per unit. So, before purchase one unit incinerator, you have to make clear following items:

A, burn what? Incinerator is a incineration equipment, function is fire waste. So what kind of waste you want to treatment?

B, small or large? This according to the waste output every day or the waste volume per feed time, like animal size.

C, fuel? Incinerator use oil or gas fuel, generally, gas fuel is cheaper than oil and the smoke cleaner than oil fuel model. But some local site don’t have gas supply system.

And other technology items, like power(220v, 380v), waste feed door type, incinerator structure, etc.

 

After you clarify these, you can go to find a local or international manufacturers, asking prices, technical specifications and ultimately purchasing the right products.

 

INCINERATOR QUESTIONNAIRE

1. Type of waste: Trash  
2. Any other type:
3. Quantity of waste generated per day in kg: (50 Ton per day) SOW
4. Duration – incinerator will be used per day: (Minimum 12 hours) SOW
5. Approximate moisture content: 
6. Local incinerator operating and emission standards: US-EPA 
7. What is the height of the chimney required: Not known
8. Fuel proposed to be used: Deiseal Oil 
9. Availability of power and type: 220 or 110 
10. Details of space available: Plenty of space 
11. Do you require an automatic loading system: [**] Yes  [**] No 
12. Do you require a gas scrubbing system: [**] Yes  [ ] No 
13. How soon do you require the system to be delivered: 30 
14. Any other specific requirements:
15. Nature: (Solid/Semi-solid/Liquid)
Burning Capacity: 125 kg minimum/time (3-6times/day), double chamber, double combustion system
Imputing door Mouth Width (mm): 760*760 (approx.)
Chimney External Diameter (mm): 300 ± 10
Combustion Improver Device: 0.11kw, Fuel consumption: 7kg/ hour (max)
Re-Burning Device: Oil consumption: 5kg/h, 0.37kw, Oil consumption: 10-20kg/h
Voltage: 380v/220v AC, Warranty: 1 Year, 50 Hz 

small waste incinerator for ZAMBIA model YD30C

YDC incinerator is latest design for waste treatment, include medical waste, animal cremation and other solid waste. 
This equipment quality structural for kinds of site, like hospital, environmental department, animal cremation agencies, 
etc. CLOVER Incinerator supply updated models with dual combustion chamber, mix combustion chamber and smoke 
filter chamber with refractory lines, and the combustion chamber temperature up to 1200 deg C.

Items Specification
YDC Model YD-10C / YD-20C / YD-30C / YD-50C
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)
WWW.HICLOVER.COMWaste Incinerators Auto Roll Air Filters
Nanjing Clover Medical Technology Co.,Ltd.

Tel:  +86-25-8461 0201   

Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: sales@hiclover.com
Email: hicloversales@gmail.com  

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 2100 kgs 2100 kgs 2300 kgs 2500 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200

Floor Weighing Scale
“A digital weighing scale is needed to accurately weigh the wastes before entering the sterilizer. All the components of the plant are at the same ground level, so the balance should allow weighing the cart with wastes easily then roll it into the sterilizer.The size of the balance platter are left to the supplier as they will depend on the sizes and weights of the provided carts. Minimum size will be 900X550X6 mm.The power in the building has a voltage 200-240, therefore, the scale should work safely with this power and in addition should satisfy the following: 
? Durable construction with Stainless Steel Platter 
? Bidirectional RS-232 data interface 
? Easy-to-read 1″” / 25.4 mm high LCD Display with Backlight 
? Weighing units conversion through keypad: kg, lb, oz, counting 
? Auto zero tracking 
? Stability and low battery indicator 
? Overload and underload indication 
? Auto off (battery) 
? Power: AC/DC Adaptor 12VDC Operating Temp.: 5-35 °C. Digital indicator can be wall mounted and is connected to the weighing platform by a spiral extension cable (Length >1 m)

Truck cleaning set
A basic truck cleaning system shall be offered, consisting of a supply of surface disinfection chemicals, a knapsack sprayer and a high pressure cleaner. The containers shall be sprayed by a surface disinfection solution, will be scrubbed and afterwards finally cleaned with the pressure cleaner. 200 litre of approved, concentrated surface disinfection solution shall be supplied. 
The knapsack sprayer shall be of daily commercial use type and come with standard accessories: Pivoting stainless steel spray lance, flexible high-pressure hose, easy-press trigger gun,  shoulder strap and hand spray gun. The tank volume should be not less than 5 l with a maximum pressure of 5 bar.  It shall be a steel sheet container, hot-dip galvanizes with manometer, bleeder valve, TüV and GS certificated and different kinds of nozzles as accessories.
The high-pressure cleaner shall be delivered with the cleaning equipment. Power supply shall be 1/230/50 (~/V/Hz), the water flow rate should be about 230-560 l/h and the operating pressure  30-130/3-13 (bar/MPa . The max. water feed temp. shall be 60 °C.
Radiation detector  
“A mobile, hand-held radioactive detector shall be supplied to check the radioactive wastes in the medical wastes and to prevent radioactive wastes from entering the system. The acquired information must be recorded to the system automatically. The detector must warn both auditory and visually.

It should have two electrodes and be able to be adjusted according to beta and gamma rays and it must be approved by an Atom Energy Institution. 
Monitoring package
A one year supply of monitoring equipment and consumables for monitoring shall be supplied together with the plant. The package shall include 2500 standard chemical indicators test stripes (indication of successful reaching of the treatment temperature by colour change).
300 biological spore test (Bacillus Stearothermophilus) and one incubator for spore test (55°C). The biological spore test shall be adjusted for the chosen treatment temperature and time.
52 standard Bowie Dick test set (non-reusable) for the test of successful air removal (only if the treatment plant is using a vacuum process) 
Personal Protection Equipment 
Sets of PPE designed for the working with bio-hazardous materials (Risk level I to III) shall be provided. Each set shall include at least: one pair of safety boots (size to be determined later), one overall (size to be determined later), 30 masks, 1 pair needle stick proof Gloves, 3 goggles. 
The needle stick proof gloves shall be made with a Nitrile Butadiene coating (water repellent) which shall cut down penetration by blood and body fluids, sewage etc. The inner Gloves are made from knitted Kevlar for cut resistance, and have more than 350 elasticated steel Teflon platelets incorporated into them to stop needles penetrating. Test Standard: Injection Needle, DIN 13097, ISO 7864.
Sets of PPE designed for the working with steam treatment plants shall be provided. Each set shall include at least: one pair of safety boots (size to be determined later), one overall (size to be determined later), 30 masks, 1 pair Heat resitant gloves, 3 goggles. 
“Heat resistant gloves, Made from Kevelar, Application: Personal Protection Equipment for the loading / unloading of waste bags in incinerators, autoclaves, etc, 
? High heat resistant
? Good protection against cuts

Waste disposal equipment
Cart-Hydraulic loader (hydraulic operated bin lift-tip device)
“External, moblile lift tipping device with a control system. Must come with a hydraulic power pack consisting out of an electrical motor with oil-pump working with a centrifugal fan pump. Hydraulic valve shall direct the flow of oil so that the tilting structure moves upwards or downwards when pressing the corresponding push-button switches. Effected by two-hand operation. The device shall be designed to emptying the treatment container of the reatment plant directly into the waste skip without spillages.

“Width x Depth x Height: about 2 x 1.8 x 3.4 m
Minimum lifting capacity 500 kg
Electrical Data >2 kW
220C240 V/50Hz
Tilting Height >1.7 m”
Waste Skip (5,5 m3)
“Waste Skip (container) with 2 hatches
Volume: 5,5 m3, Liquid proof
Built in accordance with DIN 30720
Materials
Bottom C Mild steel – 5mm
Sides C Mild steel, 4mm
Hatch C Mild steel- 2,5 mm.
Reinforcement  RSC 76mm x 38mm x 6.7kg/metre
Lifting Lugs: 4 no Shepperd Meiler type manufactured skip lugs welded through both the channels and side plates
Tipping Bars 35 mm mild steel tipping bar with FLT6 mm pressed plate supports
Hatches to be fitteld with a detachable handle to ease opening, each hatch shall be fitted with 2 steel hinges and secured using a hasp and staple to which a padlock may be fitted
One coat primer, two coats finishing enamel in colour of your choice.
Anticorrosion protection: One coat primer, two coats finishing enamel in light green (RAL) 
Each dump hatch shall be equipped with a spring for facilitating opening
Containers should be equipped with effluent grate with drain valve. “
Deposit Tipper Truck
“Truck:
Should have a wheel base of >2750 mm.
Load capacity >5 tons
Cabin type: single cabin  
Engine capacity: >100 Kw, Fuel type: Diesel  
Gearbox kind: Manual, Number of Gears: 5  
Power steering: yes  
Number of seats: 2 with appropriate seat belts, with Sun Visor
Cloth Seat Covers and rubber floor mats (ruffnuts).
Front & rear mud flaps.
Lockable fuel cap, factory type where applicable.
Should come with an Hour meter.
Spare tyre and rim. jack, wheel brace and spanner. A spare tyre carrier is also to be fitted.
Provide two (2) amber revolving lights, both to be fitted permanently on cabin or roof bar. “
“Deposit tipper mounting:
For carriages up to 3 tons total weight to transport skips ranging from 1.5 to 7 cbm.
Compact design for good manoeuvrability. 
The system should work with two separately operated rotating arms and a telescoping equipment which enables stacking of containers
Expansion to the left and to the right should be separately operated, skip should be able to be clamped on to the loading area. 
Should come with two built in front stoppers which secure the skip to the front.
An additional securing with straps or chains should not be necessary.”
Other Works
Supply, install and operate Ventilation Works:
A complete washable aluminum centrifugal fan with its own electric motor, vibration stoppers,and air cleansing filters,according to the specifications and as follows: 280 m3/min at a 50 mm water static external pressure.  
A complete washable axial exhaust fan with rain protective cover and its own electric motor, according to the specifications and as follows: Ex-1 fan 70 m3/min at a 50 mm water static external pressure.  
0.7 mm galvanized iron sheets air passages with controllers according to specifications and industry standards.    
Un-painted Aluminum air outlets with the dimensions shown in the drawings and according to technical specifications.  
Supply and install a cold storage room
“Supply and install a modular storage cold room including cooling system with a size of about 4m x 6m and about 2 m high. The temperature in the cooling room shall not be more than 7°C. The cold room shall be constructed of prefabricated insulated panels. The panels should be fire resistant Class 1, the refrigeration equipment should be ‘CE’ approved and appliance tested at point of construction or after installation.

“The exterior height of the room including floor and ceiling panels shall be 2000 mm. Corner panels shall be formed in one piece for greater strength and ease of installation. Panels shall be of foamed-in-place polyurethane, which will be blown using, CFC/HCFC agent sandwiched between galvanised steel substrate minimum 0.6mm thick and the outer surface will be white polyester.
The polyester thickness shall be minimum 25mm and with a smooth finish for ease of cleaning. Edges of all panels including wall/wall, wall/corners, wall/ceiling, wall/floor shall be male, female jointed to give good insulation factors and be equipped with cam action locking devices to all sections, locking devises to be foamed-in-place at time of fabrication.”
“Floor panels shall be same as wall panels with the addition of marine plywood surface coated with a non-slip glass fibre resin suitable for pedestrian traffic and trolleys with rubber wheels. Floor panels to be capable of supporting 250kg per 0.145 m2 evenly distributed when panels are fully supported. 
Insulation Factors:
Each panel shall be completely filled with rigid CFC/HCFC Free polyurethane foam to a density of no less than 40kg/m’ and having a thermal conductivity of 0.28 w/m2 k. The panels will also have: –
A.    Coefficient of thermal conductivity of gn = 0.024 w/mk
B.     Coefficient of thermal expansion n.70 x 10-6/k
C.    Water vapour transmission rate (0,1…1,2) x 10-12kg m/m2 sPa
D.    Water absorbency in 100% relative humidity max. 0.2 volume%
Overall thickness of each panel is 100mm. “
“The assembly of the cold room shall be accomplished by excentric action cam lock panel fasteners. These shall be foamed in place and activated by hex key wrench provided with each cold room. All butted joints on exterior where visible and all interior joints should be sealed by silicon mastic provided with the room, to ensure no debris or dirt can accumulate at any time.
The cold room shall be equipped with one (1) semi-rebated hinged door complete with heavy duty hinges and lockable door handle, fitted with a luminous emergency entrapment release, which will override the locking mechanism. Door gaskets will be of a pullout push-in type for easy field replacement. Door surround and threshold will be in stainless steel Grade 304. The door shall provide a clear opening of minimum 900 X 1900 mm. The door blade will be of the same finish as the room panels supplied.”
“The room shall be fitted with an on-board air cooled refrigeration system capable of holding waste at the required temperature of +6 to +8°C The unit shall be manufactured to take up the full length of a panel and take condenser air from the coolest area i.e. Bottom of unit. The condenser will be fitted with a filter, which can be removed for easy cleaning. The unit shall be selected to operate in ambient temperatures of Yemen. A control panel shall be incorporated to include a digital temperature display that will be easily adjusted to the required temperature.
The refrigeration system should use environmentally friendly refrigerants. The unit shall also be supplied with bulkhead light and light on/off switch. “
Civil Works:Execute all the civil works according to specifications:
Reinforced concrete for the hall floor, including a layer 15cm thick of plane concreted and stone. 
Supply and install an epoxy-insulating layer on the hangar-lab floor at the rate of  0.5 litre/m2 over the lightly reinforced concrete with all necessary requirements for the conclusion of works according to the drawings and specifications, and the instructions of the supervising engineers.
Plastering work according to specifications
Supply and install ceramic tiles similar to the existing one for the walls of the hangar in accordance to specifications. 
Supply, install, operate, testing and handing over the electrical works including all work requirements such as plastic pipes, wires, cables, switches, sockets, and whatever needed according to the European specifications and norms. The contractor shall be responsible in case of supplying apparatuses or materials that are not approved by the management or the supervising engineer:  
An armed copper ground cable (7x240mm2+1x240mm2) extending from the transformer to the main board. The price covers excavation and back-filling, the warning strip, pipes, and whatever needed for concluding the job according to the drawings, specifications, and the supervising engineer’s instructions.
Ditto, but cross section (4x70mm2+25mm2)
Ditto, but cross section (4*70mm2)
Ditto, but reinforced with the cross section (4*25mm2 + 16mm2)
Ditto, but normal with the cross section (4*25mm2 + 16mm2)
Ditto, but  normal with the cross section (4*16mm2+10mm)
Ditto, but reinforced with the dimension (4*16mm2+10mm)
Armed copper ground cable (4×10 + 6mm2) for lightening the site and the fences. 
A complete earthing system 
Supply, install and operate a main distribution board with 10 lines, 800 ampere equivalent to Legerand type or ABB.The item includes the installing of the board on a concrete base with room partition.It shall include:
One (800 A) 3 Ph MDB 
One (2×160 A) 3 Ph Branch C.P.
Two (2×100 A) 3 Ph Branch C.P
Four (4×63,3 A) 3 Ph Branch CP
The contact breakers shall be of the MCCB type. 
A normal 80 Watt 50 cm dangling lamps from the roof 
125-Watt halogen down light systems, with an arm, and an internal and external wall base.
 35 cm-diameter fans for drawing air out at the café and WCs
15 Ampere 220 V 3-openings electric socket with switch 
 20 Ampere 220 Volts electric socket with a red indicator
Supply and install a telephone socket at the hall and management room
Supply, install and operate a fire alarm and fire fighting system including all parts and accessories required to operate the system in accordance with the drawing and specifications:
A sensitivity scalable T type Ionization smoke detector that works in air-conditioned and non-conditioned spaces including its complete cables in reinforced pipes.
A heat detector that is sensitive to the rapid rise of temperature and can work with a stable pre-determined controllable temperature, complete with cables in reinforced pipes.
A sirne should be installed to work automatically through the detectors and the volume level can be varied between 85:95 db according to the drawing complete with its cables.
A break glass according to the drawing and specifications.  
A fire alarm control pannel complete with cables in reinforced pipes.
Fire fighting foam in full 25kg containers with carrying wheels of a guaranteed source with all accessories
Fire fighting dry powder in full 6kg containers, of a guaranteed source complete with carrying frame and all accessories 
Telecommunication: To connect the office building to the telephone network and to install one switchboard for at least 2 lines. 
Operate and maintain the whole plant for one month including training the management local staff on its operation and maintenance through out the one month. 

Clover's Social Media