Doubel Combustion Chamber

All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.

Read More

High Temperature Incineration

Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.

Read More

Get Lastest News

There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation

Read More

Nanjing Clover Medical Technology Co.,Ltd.

Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201

Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.

Latest Post

Poultry Incinerator Design for Pets Cremation Business



Model

A1500

Picture

 

Brand/Product Code

HICLOVER/N1134

Burning Rate

Typical 50 kgs/hour

Feed Capacity

Average 150 kgs/feeding

Primary Combustion Chamber

1500 Liters

Secondary Combustion Chamber

500 Liters

Mix Combustion Chamber

Yes

Smoke Filter Chamber

Yes

Feed Mode

Manual

Voltage

220V/380V

Fuel Type

Diesel Oil/ Organic Gas/LPG

Burner

Italy Original

Oil Consumption (Diesel Oil)

Typical 34 kg/hour

Gas Consumption (Natural Gas)

Typical 41 m3n/hour

Internal Dimensions

150 x 100 x 96cm (primary chamber)

External Dimensions

240 x 170 x 380cm (without chimney)

Infection Monitor

Yes

Oil Tank Capacity(if Petroleum Gas )

300 Liters

Door Opening

59 x 81cm

Chimney Length

10.0 Meters

Chimney Sort

Stainless Steel

Equipment Gross Weight

7500 kgs

Operation Technical Specifications

Primary Chamber Temperature

800℃–1000℃

Secondary Chamber Temperature

1000℃-1200℃

Residency Time

2.0 Sec.

Burning Efficiency

>98%

Waste Lower Calorific Power

3000Kcal

Pet Incinerator,Best incinerator manufacturers
HICLOVER Solution for Fighting COVID-19, with ISO9001:2015/CE(2006/42/EC,2014/30/EU) Certification.
1. Medical Waste Incinerator(Containerized Mobile Incinerator|Top Loading Incinerator)

2. Auto Roll Air Filter for Clean Room(Air Purification)

Nanjing Clover Medical Technology Co.,Ltd.
Tel:  +86-25-8461 0201    

Mobile: +86-138139 31455
WhatsApp: 008613813931455
WhatsApp: 008615380948599
Twitter ID: @hiclovercom
Wechat: 008613813931455 (ID: hiclovercom)
Wechat: +8615380948599 (ID: wasteincinerator)

Website1: www.hiclover.com 
Email1:     [email protected]       
Email2:    [email protected]    
Email3:  [email protected]   

HICLOVER Incinerator/Parts Range

Main Feature

Medical Waste Incinerators

HICLOVER 10-500kgs/Hr.Double Combustion Chambers

Single Combustion Chamber

Small, Cheap,10-20kgs/Hr.

Three Combustion Chambers(Optional)

3 Ranked for high risk waste

Pet Cremation Equipment

For Pet(small/big) Cremation Business

Animal Incineration Equipment

Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC)
Brand HICLOVER HICLOVER HICLOVER HICLOVER
Burn Rate (Average) 10 kg/hour 20 kg/hour 30 kg/hour 50 kg/hour
Feed Capacity(Average) 20kg 40kg 60kg 100kg
Control Mode PLC PLC PLC PLC
Combustion Chamber 100L 210L 330L 560L
Internal Dimensions 50x50x40cm 65x65x50cm 75x75x60cm 100x80x70cm
Secondary Chamber 50L 110L 180L 280L
Smoke Filter Chamber Yes Yes Yes Yes
Feed Mode Manual Manual Manual Manual
Voltage 220V 220V 220V 220V
Power 0.5Kw 0.5Kw 0.5Kw 0.7Kw
Oil Consumption (kg/hour) 5.4–12.6 7.8–16.3 10.2–20 12.1–24
Gas Consumption (m3/hour) 6.2–11.4 8–15.7 9.8–20 9.9–26.1
Temperature Monitor Yes Yes Yes Yes
Temperature Protection Yes Yes Yes Yes
Oil Tank 100L 100L 100L 100L
Feed Door 30x30cm 45x40cm 55x50cm 70x55cm
Chimney 3Meter 3Meter 5Meter 5Meter
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Gross Weight 1500kg 2200kg 3000kg 4500kg
External Dimensions 140x90x120cm 160x110x130cm 175x120x140cm 230x130x155cm

For other animal incineration


Items/Model

TS100(PLC)

TS150(PLC)

TS300(PLC)

TS500(PLC)

Burn Speed (Typical )

100 kg/hour

150 kg/hour

300 kg/hour

500 kg/hour

Control Mode

PLC Auto.

PLC Auto.

PLC Auto.

PLC Auto.

Combustion Chamber

1200L

1500L

2000L

3000L

Internal Dimensions

120x100x100cm

150x100x100cm

170x120x100cm

210x120x120cm

Secondary Chamber

600L

750L

1000L

1500L

Smoke Filter Chamber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Dry Scrubber

Feed Mode

Manual

Manual

Manual

Manual

Voltage

220V

220V

220V

220V

Electricity

1.38Kw

1.69Kw

2.57Kw

4.88Kw

Diesel Oil Consumption (kg/hour)

Ave.20.4

Ave.24.2

Ave.33

Ave.44

Natural Gas Consumption (m3n/hour)

Ave.24.5

Ave.29

Ave.39.6

Ave.52.8

Infection Monitor

Yes

Yes

Yes

Yes

Temperature Protection

Yes

Yes

Yes

Yes

Oil Tank

200L

300L

500L

500L

Chimney

10Meter

10Meter

14Meter

14Meter

Chimney Type

Stainless Steel

Stainless Steel

Stainless Steel

Stainless Steel

1st. Chamber Temperature

800℃–1000℃

800℃–1000℃

800℃–1000℃

800℃–1000℃

2nd. Chamber Temperature

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

1000℃-1200℃

Residency Time

2.0 Sec.

2.0 Sec.

2.0 Sec.

2.0 Sec.

Gross Weight

6000kg

8500kg

11000kg

16000kg

External Dimensions

260x150x180cm

300x160x190cm

400x210x300cm


CE and ISO Certification Pass Incinerators

450x210x300cm

 


Smallest Waste Incinerator for PPE waste face mask glove Squander


Smallest Waste Incinerator for PPE waste face mask glove waste
Ave 400kgs for shipping, 1 chamber, 1 burner ,1 air fan, 1 control box, 1.5Meter chimney
ave 10kgs per hour, 100kgs per day(10hr/day working)

Equipment Technical Specifications

Model

YD-10

Picture

 

Feed Capacity

Average 20 kgs per feeding

Burning Rate

Average 10 kgs per hour

Burning Time per Feed

2 hours

Voltage

220V

Power

0.5Kw

Gas

Diesel Petroleum

Burner

Italy Burner

Feed Mode

Manual

Fuel consumption (Oil)

Ave. 4.2 Kgs/Hour

External Dimensions

Dia.100 x 130cm (mainbody)

Internal Dimensions

Dia.50 x 80cm

Waste combustion chamber

200Liters

Oil Tank Capacity

100 Liters

Door Opening

35 x 35cm

Chimney

1.5M

Gross Weight

Ave.400kgs

Chamber Material

Refractory Concrete&Ceramic Fiber 

Max.

42,000Kcal/Hr.

Operation Technical Specifications

Chamber temperature

8000C -10000C

Chamber Anti-Rate

14000C

Burning efficiency

>98%

Waste Lower Calorific Power

3000Kcal

HICLOVER Solution for Fighting COVID-19, Medical Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: http://www.hiclover.com/ 

Nanjing Clover Medical Technology Co.,Ltd.


 


INCINERATOR DIESEL FIRED

Incinerator 20 Kg
Incinerator electrically operated
including:
 A cage for receipt of biomedical waste;
 A combustion chamber with fireplace with a filter to retain ashes;
 A cover;
 An air supply;
A turbine  allowing supply air.
 Combustion temperature: 1800 ° C.
Comes with all accessories.     ▪      The incinerator should be a modern waste disposal unit, designed
to bum medical waste in a clean and environmentally efficient
manner. It should employ a temperature based logic control system
to provide optimum control of the operating conditions and
incorporate a high capacity thermal oxidizing secondary chamber.
It should be designed to retain the exhaust gases, for at least 2
seconds to ensure the unit’s effective destruction of the combustion
products.
▪      All the incinerators to be supplied and installed meet the
Waste Management Regulation 2006, legal notice No. 121 of
29th September 2006 and in particular 3rd schedule regulation
(26, 47) pertaining classification, standards, criteria, and
procedure for installing and operating incinerators.
▪      The capacity of the incinerator required should be to the
specifications with a capacity to burn 100kgs/Hr.
▪      The incinerator shall be run on a three-phase power supply
(mains).
▪      For the technical evaluation, not only the treatment plant but
the entire system will be considered. It will be the responsibility
of the Bidder to supply a full system, including all eventually
additionally necessary secondary systems and additional
equipment.
▪      The system offered shall be designed to operate normally under
the conditions of the purchaser’s country. The conditions include
Power Supply, Climate, Temperature, Humidity, etc.
▪      The Bidder must provide a warranty for one year.
▪      All text, parameter etc. on all control operating interfaces as
well as on information displays and on print-outs shall be in
English language.
▪      The Bidder is responsible for all permits and approvals for
importation. The Bidder shall provide all the necessary
documentation in order to facilitate the legal requirements for the
installation and putting into use of the equipment.

▪      Period of Execution is 90 days from contract signature for
delivery to site and completion of all verification operations
required for the issuance of provisional acceptance.
▪      Representatives of the Contracting Authority and the
Beneficiary, together with the Bidder’s representative, shall
carry out the controls, testing and initial approval for provisional
and final acceptance. The provisional and final acceptance shall
take place at the final destination.
▪     After-Sales Service: The Bidder is required to ensure that a
maintenance, service and repair centre, which is authorized by
the Manufacturer, and which is able to rapidly supply genuine
spare parts and consumables recommended by the Manufacturer
is available throughout the one year warranty period. In
fulfillment of this requirement with their offer, bidders must
submit a statement signed by the manufacturer or representative
of the manufacturer:
ͦ Providing the name and address of its authorized
maintenance, service and repair centre,
ͦ Confirming that this authorized maintenance, service and
repair centre is able to rapidly supply genuine spare parts and
the consumables recommended by the Manufacturer; and
▪      The Bidder will be responsible to deliver and install all
equipment supplied to the hospitals in the
Republic of Kenya. The Bidder shall deliver a time schedule over
the complete construction and assembling period. The delivery
and installation time must be agreed between bidders, target
Hospital and the Contracting Authority. The treatment plant must
arrive pre-assembled. The Bidder shall ensure that all parts of
the plant transported by sea shall not be shipped as “deck
cargo”.
▪      It is expected that the Bidder cooperates closely with the
contractor for the new waste handling building/ housing and will
make available all needed technical information, drawing, etc. to
the contractor.
▪      The Bidder shall supply and install the incinerator with the
following attached specifications

For the Supply, installation & commissioning of a Medical Waste Incinerator as detailed below:
i.    Waste type    Health care waste
ii.    Waste density    125 to 350Kg/M3
iii..    Waste Calorific Value    4000 KCAL/Kg
iv.    Moisture content    10-25%
v.     Estimated ash  residue    5-10%
vi.     Nominal capacity     100Kg/hour batch load
vii.     Secondary chamber    2 seconds @ 1100°C
viii.    Environmental    Environmental Management Coordination Act, 1999 and in particular, Waste management regulations, 2006
2    Equipment
2.1    Primary Combustion Chamber
▪       The primary combustion chamber is the main structure of the
incinerator, fabricated from mild steel plate and stiffened with
rolled steel sections. It is carried from the floor level on a
substantial steel support frame. Internally the shell is lined with
calcium silicate insulation and a hot face combination of super
duty brickwork or high strength castable.
▪       The primary combustion chamber must ensure minimum exit
temperature is not less than 850°C.
One Manual Load Incinerator comprising:
▪       Manual Loading door (heavy duty steel door with appropriate
refractory lining)
▪       Horizontal solid hearth, refractory lined primary combustion
chamber. Approximate dimensions 800 mm diameters x 2100mm
long
▪       Full sized bulk load/ash removal door
▪       1 off diesel-fired ignition burner — temperature controlled
▪       1 off combustion air supply fan and distribution system, automatic
control
▪       High capacity secondary combustion chamber with residence time
not less than 2 seconds @ >1100°C
▪       1 off diesel-fired afterburner — temperature controlled
▪       Control panel — automatic operation
▪      Temperature indication primary and secondary chambers 0-
1200°C. Both chambers must be insulated with refractory
material (super duty 100mm thick firebrick with 25mm thick
calcium silicate insulation)
Note: The secondary combustion chamber must ensure that the gas temperature as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100°C.
2.2     Throughput
100kg/hour at a nominal calorific value of 4,000 kcal/kg and an average bulk density of I20kg/ M3 for general waste and l60kg/ M3 for health care waste.
2.3    Ash
The waste will be reduced by 90~95% to leave 10 -5% ash
2.4    Quality/Environmental Standards
▪       Environment Management and Coordination Act, 1999
▪       BS3316
2.5    Operating Period
▪      Anticipated daily operating period 8 hours
▪      Maximum operating period 12 hours
2.6    Chamber
▪      Should be refractory lined to the following standard; Hearth and
lower section of chamber walls
2.7    Hot face material
▪      Super duty firebrick
▪      Limiting continuous service limit 1500°C
▪      Thickness 100mm
▪      Thermal conductivity 1.3 W/mk
2.8    Insulation
▪      Calcium silicate
▪      Limiting continuous service limit 1000°C
▪      Thickness 25mm
▪      Thermal conductivity 0.095 W/mk
2.9     Chimney / Stack
▪      Should be manufactured from refractory lined mild steel or high
quality air-cooled stainless steel. The chimney/stack should have a
minimum height of 10 meters above ground level.
▪      Refractory lined flanged chimney must be above the height of
any existing roof adjacent to the incinerator
▪      Provide lifting gear to hoist, erect and mount chimney, and
provide supports slings as necessary. Allow for cutting of tree
branches to facilitate the exercise.
▪      The chimney shall be painted with approved heat resistant
paint after installation.
2.10     Ignition Burners
Fully packaged oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and complete with all valves, fan and motor.
·         Maximum rating:            at least 450kW/hour
·         Burner:                            arranged for on/off operation
·         Maximum consumption: at least 6 litres/hour
·         Average consumption:    at least 3 litres/hour
2.11    Afterburner
Fully packaged oil type, complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor.
Maximum rating:    at least 450kW/hour
Burner:    arranged for on/off operation
Maximum consumption:    at least 9 litres/hour
Average consumption:    at least 4.5 litres/hour
2.12    Flue gas treatment
▪      Should have particulate remover (scrubbers). A mechanical
particulate collector must be incorporated after secondary
combustion chamber for removal of particulate pollutants
entrained in the flue gas stream.
2.13    Diesel Tank
▪      To provide for diesel services tank (Capacity 400 litres)
including level indicator
▪      The tank should be connected to the incinerator at higher level
to enable free-flow of diesel from the tank to the incinerator.
The connecting pipe must be a black pipe of approved gauge
and diameter. Include other accompanying accessories and
fittings
▪      Connect burners to fuel supply.
2.14     Electrical Supply
▪      Three phase 415 V a.c., 50/60 Hz.
3    Documentation:
Operation manual    2 sets
Service/maintenance manual    2 sets
4    Certification
▪      National Environment Management Authority (NEMA)
certification
5    Capacity to service equipment
▪      The agent/supplier shall have adequate facilities, spare parts,
consumables and qualified and skilled technical staff.
Installation works
▪      Provide lifting gears as forklift, gantry, rollers, and lifting
jacks and position incinerator.
6    Commissioning and Training
▪      The Agent will test all set operating parameters

▪     The agent shall conduct a two days operation & maintenance
training to the Biomedical engineering personnel and incinerator
operators after installation & commissioning of the equipment.
7    Commissioning Maintenance Contract
▪     Before the expiry of the warranty/ signing off, the supplier shall
provide a one-year replacement service parts (e.g. oil filters, air
filters), the Quarterly routine maintenance price per quarter
for three (3) quarters.

Maintenance control proposal.
▪      The maintenance contract price includes labour, transport and
accommodation for the attending technicians.

medical waste PYROLYTIC INCINERATOR

TECHNICAL SPECIFICATIONS: PYROLYTIC INCINERATOR

Parameter Compliance
Type of Waste To treat medical waste, categories A,B,C,D,E
Type of Incinerator Pyrolytic
Nominal Burn rate 50 t0 60 kg/ hr at 3500Kcal/Kg
Loading Manual, Batch Load
De Ashing Automatic or Manual batch de ashing
The incinerator must avoid the release of black smoke and fine dust during the loading
Primary chamber capacity 2-3 m³
The insulation   of the combustion chamber should be composed   of refractory bricks, having a higher content of aluminium and insulates,
The plate of combustion in carborundum avoiding the fixing of glass and slags
Hours of operation /Day >10 hrs
Max Operating Temperatures 1400 °C
Normal Operating Temperatures(Primary) >850 °C
Operating Temperature(Secondary) >1100 °C
It should have digital temperatures regulator( Temperatures regulator in digital watch)
Carbon content of ashes <2%
The installation should be completely free from visible smoke as well as offensive odours
Residence time in second chamber 2 second minimum
The internal diameter of the Chimney :Ø 400
Height of stack >8m
Burner operation Automatic On/Off
Fuel Diesel
Fuel consumption at raed capacity >7kg waste /ltr
Electricity consumption <2kW at rated capacity
Operating Voltage 220 – 240V AC 50Hz
Spare parts Supply for 1 year quoted as option
Consumables Supply for 1 year of operation to be mentioned as option
Warranty Parts and service support: 1 year minimum post comissioning
Service support <72 hours
Emission standard Compliance BS3316 or equivqlent standard
Process filtering system Scruber to be mentioned as option
CE Manufacturing Compliance BS EN 746-2-1997
Design Specification Type A,B,C,D,and E of medical waste
Installation and Comissioning Included in condition of supply
Training in preventive and curative maintenance and use of the incinerator Operator training inclusive in offer
Capacity to treat Plastic Not less than 40% by weight

 

small scale incinerator

Incinerators Biological waste disposal system (incinerator)

Incinerator must meet the following specifications:

–       Combustion capacity (kW) = 581 +/-10%

–       Combustion capacity (kcal/h) = 500,000 +/-10%

–       Max. l/h (at approx.. 50% water content) = 100 +/-10%

Further specifications will be provided with the inquiry.

The incinerator shall be fully self contained.

The incinerator plant shall incorporate a control panel for its operation. On the control panel we shall have a visual display of the chamber temperatures. This visual display must control and monitor the incinerator and his performance.

Capacity of destruction in weight shall be 60 Kg/h.

It should be able to operate not less than 10 hours/day

This incinerator must be able to destruct all combustible wastes produced by hospitals, private clinics, laboratories, institutes, etc…

Design Specification : Types A, B, C, D, and E of medical waste

“PYROLYTIC” combustion, by controlling the gasification of waste.

The incinerator must avoid the release of black smoke and fine dust, during the loadings.

It shall be able to reduce the volume of wastes by 98%.

It shall be able to hold emission in the second burn with gas residence of not less than 2 seconds.

The incineration should be completely free from visible smoke as well as offensive odours.

1.0The primary ignition burner shall providing ignition of the waste to 850 °C and must switch off to conserve fuel.

The primary combustion chamber shall be constructed from heavy steel plate and the unit is internally lined with a complete layer of hote face refractory and high efficiency insulation.

The Internal diameter of the Chimney at least: ? 400 and its height: 8 m

The Volume of the combustion chamber at least: 1.200 L

The Dimension of the door for loading in cm at least: 70×70.

Burner operation should be Automatic On/Off
Fuel?: diesel

Manufacturer to provide  necessary information for the best of  the installation

The control panel shall have all appropriate audible and visual alarms to ensure safe operation.

This incinerator with “PYROLYTIC” combustion must have:
1.A combustion chamber of waste:
oPerfectly tight door for the manual loading of waste. The loading should be Manual, Batch Load
oA burner of lighting which the use is limited to the ignition of waste.
oFrontage of loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.
oThe insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium and insulates bricks in order to assure a minimum temperature on the outside sheet metal.
o Composition of the refractory;

?Refractory concrete :
. Thickness    : ≥100 mm
. Nature: 42% of Al203
?Insulate in fibrous panels :
Thickness: ≥75 mm
Nature: Calcium silicate.
?Burner of lighting of waste, with fuel, standard mono-bloc casting guiding  plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
Plate of combustion in Carborundum, avoiding the fixing of glass and slags

A chamber of post combustion of gases
oA burner of combustion of gases,
oA device of injection of air allowing a total recombustion of gases,
oA device of air inlet of cooling of waste gases,
oA sheath of evacuation of the gases burnt.
oCarcass in strong sheet steel with support of connection.
oComposition of the refractory;
?Refractory concrete :
?Thickness    : ≥150 mm
?Nature: 65% of Al203
?Insulate in fibrous panel :
?Thickness: ≥85 mm
? Nature: Calcium
oBurner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
oA secondary injection of air to ensure perfect oxygen content.

A control box ensuring the complete cycle of combustion.

Fan:
oElectro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.
Controls and regulations:
Control box watertight to dust, including:

A switch circuit breaker for each engine (ventilators and burners).
A timer with adjustable temporization for the regulation of each burner.
A regulator with digital watching for the temperature of combustion.
A regulator with digital watching for the temperature of post combustion.
Electric box

The secondary combustion chamber must destroy the contaminant product and must resist to high temperature(1100 °C)

Process Filtering system: Scruber to be mentionned as optional

Clover's Social Media