Waste type: health care waste
Waste density: 125 to 350Kg/M3
Waste calorific value: 4000KCAL/kg
Moisture content: 10 – 25%
Estimated ash residue: 5 – 10%
Nominal capacity: 50kg/hr batch load
Secondary chamber: 2 seconds@850?C
Environmental: NEMA ACT (EMCA) 1999, Waste Management regulations, 2006
Primary Combustion chamber:
The primary combustion chamber is the main structure of the incinerator, fabricated from mild steel plate and stiffened with rolled steel sections.

It is carried from the floor level on a substantial steel support frame.  Internally the shell is lined with calcium silicate insulation and a hot face combination of super duty brickwork or high strength castable.

The primary combustion chamber must ensure minimum exit temp is not less than 850?C.
One Manual Load Incinerator comprising:
Manual loading door
Horizontal solid hearth, refractory lined primary combustion chamber.  Approx. dimensions 800x2100mm(DxL)
Full sized bulk load/ash removal door
1 off diesel-fired ignition burner – temperature controlled
1 off combustion air supply fan and distribution system, automatic control
High capacity secondary combustion chamber with residence time not less than 2 seconds @>850?C
1 off diesel-fired afterburner – temperature controlled
Control panel – automatic operation
Temperature indication primary and secondary chambers 0-1200?C
Refractory lined flanged chimney to a height of 10M above ground level
NB: The secondary combustion chamber must ensure that the gas temp as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100?C

Throughput: 50kg/hr at a nominal calorific value of 4,000kca/kg and an average bulk density of 120kg/m3 for general waste and 160kg/m3 for health care waste.
Ash: The waste will be reduced by 90~95% to leave 10-5% ash
Quality/Environmental Standards: NEMA ACT (EMCA) 1999,   BS3316
Operating period: anticipated daily operating period 8 hours
Maximum operating period: 12 hours
Chamber: should be refractory lined to the following standard;
Hearth and lower section of chamber walls
Hot face material:
Super duty firebrick
Limiting continuous service limit 1500?C
Thickness: 100mm
Thermal conductivity: 1.3W/mk
Insulation:
Calcium silicate
Limiting continuous service limit 1000?C
Thickness: 25mm
Thermal conductivity: 0.095W/mk
Chimney/Stack: Should be manufactured from refractory lined mild steel or high quality air-cooled s/s.
The chimney/stack should have a minimum height of 10m above ground level
Ignition burners: fully packaged oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and complete with all valves, fan and motor.
Maximum rating: at least 450kW/hr
Burner: arranged for on/off operation
Maximum consumption: at least 6Ltrs/hr
Average consumption: at least 3Ltrs/hr
Afterburner:
fully packaged oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and complete with all valves, fan and motor.
Maximum rating: at least 450kW/hr
Burner: arranged for on/off operation
Maximum consumption: at least 9Ltrs/hr
Average consumption: at least 4.5Ltrs/hr
Flue gas treatment:  should have particulate remover (scrubbers)
Electrical supply: single phase: 220/240VAC; 50/60Hz

Documentation:
medical waste incinerator for sale Operation manual: 2 sets
Service/maintenance manual: 2 sets
Certification: NEMA (or other recognized) certification
Capacity to service equipment: the agent/supplier shall have adequate facilities, spare parts, consumables and qualified skilled technical staff.
Training: the Agent shall conduct a two days incinerators training after installation and commissioning of the equipment.

The Agent shall conduct a two days operation & maintenance training to the Biomedical engineering personnel after installation & commissioning of the equipment.

Posted in Blog.