N95 Face Mask Machine Production Line on Sale Now! $250,000USD per set

N95 Face Mask Machine Production Line on Sale Now! $250,000USD per set

N95 Face Mask Machine Production Line on Sale Now! $250,000USD per set

Dimension(L*W*H): 1037*855*1780

Power Supply 15.3kw mono phase

Net Weight: approx.: 1500kg

HICLOVER – Medical Environmental 


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: sales@hiclover.com
Email: hicloversales@gmail.com  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-04-10

Containerized Mobile Incinerator Medical Waste Incinerator Model CA50

HICLOVER – Containerized Mobile Incinerator Medical Waste Incinerator Model CA50


Model

CA50

Picture

Waste Treatment

Medical Waste Incineration Treatment

Feed Capacity

Average 100 kgs per feeding

Burning Rate

Average 50 kgs per hour

Burning Time per Feed

Average 2 hour

Control Mode

PLC(Programmable Logic Controller Incinerator)

Voltage

220V

Power

1.0 Kw

Fuel

Diesel oil

Burner

Italy Burner

Feed Mode

Manual

Temperature Monitor

Digital Display

Fuel consumption (Oil)

Average 16.9 Kgs/Hour

Internal Dimensions

100x80x70cm (Primary Chamber)

External Dimensions

230 x 130 x 155cm (main body)

Waste combustion chamber

560Liters

Post Combustion Chamber

280Liters

Oil Tank Capacity

200 Liters

Door Opening

70 x 50cm

Chimney

5.0M

Gross Weight

4500kgs

Chamber Material

Firebrick ,Refractory Concrete

Max. Heat Value

166,000Kcal/Hr.

Operation Technical Specifications

Solid Chamber temperature

8000C -10000C

Gas Chamber temperature

10000C -12000C

Chamber Anti-Rate

17500C

Residency time

2.0 Sec.

Burning efficiency

98%

Waste Lower Calorific Power

3000Kcal


 

Waste Incinerators
Medical Waste Incinerator
Pet Animal Cremation
Solid Waste Incinerator

Tel:  +86-25-8461 0201   
Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: sales@hiclover.com
Email: hicloversales@gmail.com  
Nanjing Clover Medical Technology Co.,Ltd.

 

2020-03-24

small waste incinerator for ZAMBIA model YD30C

YDC incinerator is latest design for waste treatment, include medical waste, animal cremation and other solid waste. 
This equipment quality structural for kinds of site, like hospital, environmental department, animal cremation agencies, 
etc. CLOVER Incinerator supply updated models with dual combustion chamber, mix combustion chamber and smoke 
filter chamber with refractory lines, and the combustion chamber temperature up to 1200 deg C.

Items Specification
YDC Model YD-10C / YD-20C / YD-30C / YD-50C
Main Product List Primary Combustion Chamber
Secondary Combustion Chamber
Mix Combustion Chamber
Smoke Filter Chamber
Incinerator Common Control Case
Stainless Steel Chimney
Italy oil/gas burner: 02 units
Oil Tank (if oil fuel)
WWW.HICLOVER.COMWaste Incinerators Auto Roll Air Filters
Nanjing Clover Medical Technology Co.,Ltd.

Tel:  +86-25-8461 0201   

Mobile: +86-13813931455(whatsapp/wechat)
Website: www.hiclover.com  
Email: sales@hiclover.com
Email: hicloversales@gmail.com  

Items/Model YD-10C YD-20C YD-30C YD-50C
Burning Rate (kgs/Hour) 10 kgs/Hr. 20 kgs/Hr. 30 kgs/Hr. 50 kgs/Hr.
Feed Capacity (kgs) 40 kgs 40 kgs 50 kgs 80 kgs
Equipment Weight 2100 kgs 2100 kgs 2300 kgs 2500 kgs
Primary Chamber (Liters) 200 200 250 400
Secondary Chamber (Liters) 140 140 140 140
External Dimensions (cm) 170x140x160 170x140x160 170x140x190 180x160x200
Internal Dimensions (cm) 55x55x65 55x55x65 55x55x85 70x70x85
Oil Tank(Liters) 50 100 100 150
Door Opening (cm) 38 x 48 38 x 48 38 x 48 45×55
Chimney (M) 5 5 5 5
Chimney Type Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Secondary Chamber  YES YES YES YES
Mix-Combustion Chamber YES YES YES YES
Smoke Filter Chamber YES YES YES YES
Combustion Fuel Oil/Gas Oil/Gas Oil/Gas Oil/Gas
Residency Time 2.0 Sec. 2.0 Sec. 2.0 Sec. 2.0 Sec.
Temperature Monitoring YES YES YES YES
1st. Chamber Temperature 800–1000 800–1000 800–1000 800–1000
2nd. Chamber Temperature 1000-1200 1000-1200 1000-1200 1000-1200

Floor Weighing Scale
“A digital weighing scale is needed to accurately weigh the wastes before entering the sterilizer. All the components of the plant are at the same ground level, so the balance should allow weighing the cart with wastes easily then roll it into the sterilizer.The size of the balance platter are left to the supplier as they will depend on the sizes and weights of the provided carts. Minimum size will be 900X550X6 mm.The power in the building has a voltage 200-240, therefore, the scale should work safely with this power and in addition should satisfy the following: 
? Durable construction with Stainless Steel Platter 
? Bidirectional RS-232 data interface 
? Easy-to-read 1″” / 25.4 mm high LCD Display with Backlight 
? Weighing units conversion through keypad: kg, lb, oz, counting 
? Auto zero tracking 
? Stability and low battery indicator 
? Overload and underload indication 
? Auto off (battery) 
? Power: AC/DC Adaptor 12VDC Operating Temp.: 5-35 °C. Digital indicator can be wall mounted and is connected to the weighing platform by a spiral extension cable (Length >1 m)

Truck cleaning set
A basic truck cleaning system shall be offered, consisting of a supply of surface disinfection chemicals, a knapsack sprayer and a high pressure cleaner. The containers shall be sprayed by a surface disinfection solution, will be scrubbed and afterwards finally cleaned with the pressure cleaner. 200 litre of approved, concentrated surface disinfection solution shall be supplied. 
The knapsack sprayer shall be of daily commercial use type and come with standard accessories: Pivoting stainless steel spray lance, flexible high-pressure hose, easy-press trigger gun,  shoulder strap and hand spray gun. The tank volume should be not less than 5 l with a maximum pressure of 5 bar.  It shall be a steel sheet container, hot-dip galvanizes with manometer, bleeder valve, TüV and GS certificated and different kinds of nozzles as accessories.
The high-pressure cleaner shall be delivered with the cleaning equipment. Power supply shall be 1/230/50 (~/V/Hz), the water flow rate should be about 230-560 l/h and the operating pressure  30-130/3-13 (bar/MPa . The max. water feed temp. shall be 60 °C.
Radiation detector  
“A mobile, hand-held radioactive detector shall be supplied to check the radioactive wastes in the medical wastes and to prevent radioactive wastes from entering the system. The acquired information must be recorded to the system automatically. The detector must warn both auditory and visually.

It should have two electrodes and be able to be adjusted according to beta and gamma rays and it must be approved by an Atom Energy Institution. 
Monitoring package
A one year supply of monitoring equipment and consumables for monitoring shall be supplied together with the plant. The package shall include 2500 standard chemical indicators test stripes (indication of successful reaching of the treatment temperature by colour change).
300 biological spore test (Bacillus Stearothermophilus) and one incubator for spore test (55°C). The biological spore test shall be adjusted for the chosen treatment temperature and time.
52 standard Bowie Dick test set (non-reusable) for the test of successful air removal (only if the treatment plant is using a vacuum process) 
Personal Protection Equipment 
Sets of PPE designed for the working with bio-hazardous materials (Risk level I to III) shall be provided. Each set shall include at least: one pair of safety boots (size to be determined later), one overall (size to be determined later), 30 masks, 1 pair needle stick proof Gloves, 3 goggles. 
The needle stick proof gloves shall be made with a Nitrile Butadiene coating (water repellent) which shall cut down penetration by blood and body fluids, sewage etc. The inner Gloves are made from knitted Kevlar for cut resistance, and have more than 350 elasticated steel Teflon platelets incorporated into them to stop needles penetrating. Test Standard: Injection Needle, DIN 13097, ISO 7864.
Sets of PPE designed for the working with steam treatment plants shall be provided. Each set shall include at least: one pair of safety boots (size to be determined later), one overall (size to be determined later), 30 masks, 1 pair Heat resitant gloves, 3 goggles. 
“Heat resistant gloves, Made from Kevelar, Application: Personal Protection Equipment for the loading / unloading of waste bags in incinerators, autoclaves, etc, 
? High heat resistant
? Good protection against cuts

Waste disposal equipment
Cart-Hydraulic loader (hydraulic operated bin lift-tip device)
“External, moblile lift tipping device with a control system. Must come with a hydraulic power pack consisting out of an electrical motor with oil-pump working with a centrifugal fan pump. Hydraulic valve shall direct the flow of oil so that the tilting structure moves upwards or downwards when pressing the corresponding push-button switches. Effected by two-hand operation. The device shall be designed to emptying the treatment container of the reatment plant directly into the waste skip without spillages.

“Width x Depth x Height: about 2 x 1.8 x 3.4 m
Minimum lifting capacity 500 kg
Electrical Data >2 kW
220C240 V/50Hz
Tilting Height >1.7 m”
Waste Skip (5,5 m3)
“Waste Skip (container) with 2 hatches
Volume: 5,5 m3, Liquid proof
Built in accordance with DIN 30720
Materials
Bottom C Mild steel – 5mm
Sides C Mild steel, 4mm
Hatch C Mild steel- 2,5 mm.
Reinforcement  RSC 76mm x 38mm x 6.7kg/metre
Lifting Lugs: 4 no Shepperd Meiler type manufactured skip lugs welded through both the channels and side plates
Tipping Bars 35 mm mild steel tipping bar with FLT6 mm pressed plate supports
Hatches to be fitteld with a detachable handle to ease opening, each hatch shall be fitted with 2 steel hinges and secured using a hasp and staple to which a padlock may be fitted
One coat primer, two coats finishing enamel in colour of your choice.
Anticorrosion protection: One coat primer, two coats finishing enamel in light green (RAL) 
Each dump hatch shall be equipped with a spring for facilitating opening
Containers should be equipped with effluent grate with drain valve. “
Deposit Tipper Truck
“Truck:
Should have a wheel base of >2750 mm.
Load capacity >5 tons
Cabin type: single cabin  
Engine capacity: >100 Kw, Fuel type: Diesel  
Gearbox kind: Manual, Number of Gears: 5  
Power steering: yes  
Number of seats: 2 with appropriate seat belts, with Sun Visor
Cloth Seat Covers and rubber floor mats (ruffnuts).
Front & rear mud flaps.
Lockable fuel cap, factory type where applicable.
Should come with an Hour meter.
Spare tyre and rim. jack, wheel brace and spanner. A spare tyre carrier is also to be fitted.
Provide two (2) amber revolving lights, both to be fitted permanently on cabin or roof bar. “
“Deposit tipper mounting:
For carriages up to 3 tons total weight to transport skips ranging from 1.5 to 7 cbm.
Compact design for good manoeuvrability. 
The system should work with two separately operated rotating arms and a telescoping equipment which enables stacking of containers
Expansion to the left and to the right should be separately operated, skip should be able to be clamped on to the loading area. 
Should come with two built in front stoppers which secure the skip to the front.
An additional securing with straps or chains should not be necessary.”
Other Works
Supply, install and operate Ventilation Works:
A complete washable aluminum centrifugal fan with its own electric motor, vibration stoppers,and air cleansing filters,according to the specifications and as follows: 280 m3/min at a 50 mm water static external pressure.  
A complete washable axial exhaust fan with rain protective cover and its own electric motor, according to the specifications and as follows: Ex-1 fan 70 m3/min at a 50 mm water static external pressure.  
0.7 mm galvanized iron sheets air passages with controllers according to specifications and industry standards.    
Un-painted Aluminum air outlets with the dimensions shown in the drawings and according to technical specifications.  
Supply and install a cold storage room
“Supply and install a modular storage cold room including cooling system with a size of about 4m x 6m and about 2 m high. The temperature in the cooling room shall not be more than 7°C. The cold room shall be constructed of prefabricated insulated panels. The panels should be fire resistant Class 1, the refrigeration equipment should be ‘CE’ approved and appliance tested at point of construction or after installation.

“The exterior height of the room including floor and ceiling panels shall be 2000 mm. Corner panels shall be formed in one piece for greater strength and ease of installation. Panels shall be of foamed-in-place polyurethane, which will be blown using, CFC/HCFC agent sandwiched between galvanised steel substrate minimum 0.6mm thick and the outer surface will be white polyester.
The polyester thickness shall be minimum 25mm and with a smooth finish for ease of cleaning. Edges of all panels including wall/wall, wall/corners, wall/ceiling, wall/floor shall be male, female jointed to give good insulation factors and be equipped with cam action locking devices to all sections, locking devises to be foamed-in-place at time of fabrication.”
“Floor panels shall be same as wall panels with the addition of marine plywood surface coated with a non-slip glass fibre resin suitable for pedestrian traffic and trolleys with rubber wheels. Floor panels to be capable of supporting 250kg per 0.145 m2 evenly distributed when panels are fully supported. 
Insulation Factors:
Each panel shall be completely filled with rigid CFC/HCFC Free polyurethane foam to a density of no less than 40kg/m’ and having a thermal conductivity of 0.28 w/m2 k. The panels will also have: –
A.    Coefficient of thermal conductivity of gn = 0.024 w/mk
B.     Coefficient of thermal expansion n.70 x 10-6/k
C.    Water vapour transmission rate (0,1…1,2) x 10-12kg m/m2 sPa
D.    Water absorbency in 100% relative humidity max. 0.2 volume%
Overall thickness of each panel is 100mm. “
“The assembly of the cold room shall be accomplished by excentric action cam lock panel fasteners. These shall be foamed in place and activated by hex key wrench provided with each cold room. All butted joints on exterior where visible and all interior joints should be sealed by silicon mastic provided with the room, to ensure no debris or dirt can accumulate at any time.
The cold room shall be equipped with one (1) semi-rebated hinged door complete with heavy duty hinges and lockable door handle, fitted with a luminous emergency entrapment release, which will override the locking mechanism. Door gaskets will be of a pullout push-in type for easy field replacement. Door surround and threshold will be in stainless steel Grade 304. The door shall provide a clear opening of minimum 900 X 1900 mm. The door blade will be of the same finish as the room panels supplied.”
“The room shall be fitted with an on-board air cooled refrigeration system capable of holding waste at the required temperature of +6 to +8°C The unit shall be manufactured to take up the full length of a panel and take condenser air from the coolest area i.e. Bottom of unit. The condenser will be fitted with a filter, which can be removed for easy cleaning. The unit shall be selected to operate in ambient temperatures of Yemen. A control panel shall be incorporated to include a digital temperature display that will be easily adjusted to the required temperature.
The refrigeration system should use environmentally friendly refrigerants. The unit shall also be supplied with bulkhead light and light on/off switch. “
Civil Works:Execute all the civil works according to specifications:
Reinforced concrete for the hall floor, including a layer 15cm thick of plane concreted and stone. 
Supply and install an epoxy-insulating layer on the hangar-lab floor at the rate of  0.5 litre/m2 over the lightly reinforced concrete with all necessary requirements for the conclusion of works according to the drawings and specifications, and the instructions of the supervising engineers.
Plastering work according to specifications
Supply and install ceramic tiles similar to the existing one for the walls of the hangar in accordance to specifications. 
Supply, install, operate, testing and handing over the electrical works including all work requirements such as plastic pipes, wires, cables, switches, sockets, and whatever needed according to the European specifications and norms. The contractor shall be responsible in case of supplying apparatuses or materials that are not approved by the management or the supervising engineer:  
An armed copper ground cable (7x240mm2+1x240mm2) extending from the transformer to the main board. The price covers excavation and back-filling, the warning strip, pipes, and whatever needed for concluding the job according to the drawings, specifications, and the supervising engineer’s instructions.
Ditto, but cross section (4x70mm2+25mm2)
Ditto, but cross section (4*70mm2)
Ditto, but reinforced with the cross section (4*25mm2 + 16mm2)
Ditto, but normal with the cross section (4*25mm2 + 16mm2)
Ditto, but  normal with the cross section (4*16mm2+10mm)
Ditto, but reinforced with the dimension (4*16mm2+10mm)
Armed copper ground cable (4×10 + 6mm2) for lightening the site and the fences. 
A complete earthing system 
Supply, install and operate a main distribution board with 10 lines, 800 ampere equivalent to Legerand type or ABB.The item includes the installing of the board on a concrete base with room partition.It shall include:
One (800 A) 3 Ph MDB 
One (2×160 A) 3 Ph Branch C.P.
Two (2×100 A) 3 Ph Branch C.P
Four (4×63,3 A) 3 Ph Branch CP
The contact breakers shall be of the MCCB type. 
A normal 80 Watt 50 cm dangling lamps from the roof 
125-Watt halogen down light systems, with an arm, and an internal and external wall base.
 35 cm-diameter fans for drawing air out at the café and WCs
15 Ampere 220 V 3-openings electric socket with switch 
 20 Ampere 220 Volts electric socket with a red indicator
Supply and install a telephone socket at the hall and management room
Supply, install and operate a fire alarm and fire fighting system including all parts and accessories required to operate the system in accordance with the drawing and specifications:
A sensitivity scalable T type Ionization smoke detector that works in air-conditioned and non-conditioned spaces including its complete cables in reinforced pipes.
A heat detector that is sensitive to the rapid rise of temperature and can work with a stable pre-determined controllable temperature, complete with cables in reinforced pipes.
A sirne should be installed to work automatically through the detectors and the volume level can be varied between 85:95 db according to the drawing complete with its cables.
A break glass according to the drawing and specifications.  
A fire alarm control pannel complete with cables in reinforced pipes.
Fire fighting foam in full 25kg containers with carrying wheels of a guaranteed source with all accessories
Fire fighting dry powder in full 6kg containers, of a guaranteed source complete with carrying frame and all accessories 
Telecommunication: To connect the office building to the telephone network and to install one switchboard for at least 2 lines. 
Operate and maintain the whole plant for one month including training the management local staff on its operation and maintenance through out the one month. 

SUPPLY, INSTALLATION AND COMMISSIONING OF WASTE INCINERATOR – TECHNICAL SPECIFICATIONS

SUPPLY, INSTALLATION AND COMMISSIONING OF WASTE INCINERATOR – TECHNICAL SPECIFICATIONS
The Waste Incinerator is designed to burn Type IV of pathological waste and infectious, contaminated “red bag,” surgical dressings, plastic test devices and other wastes. 
General Specifications
Burner:  2 burners (primary burner and second burner)

Fuel: Oil 
Capacity (Cubic Mtr): 0.65 
Ave Capacity: 60 kg per hour 
Fuel Consumption (ltrs / hr):13 
External Dimensions
Length (mm): 2300 
Width (mm): 1220 
Height Incl. Flue (mm) 7000 
Door Opening (mm) 610 x 710 610 x 710
Operation
Min. Operating Temperature: 950 
Max. Operating Temperature: 1320 
Residency Time in Second Chamber: 5 sec 
Temperature Monitoring: YES 
Other clarification
Easy and safe operation
Large counter-balanced fill door with electrical    lockout.
Automatic control system provides preset burn times and shut off. 
Reload light indicates to operator when it is time to recharge. 
Be required for burnout of final charge.  
Low energy consumption levels 
Programmable digital temperature controls maintain temperature, assuring complete combustion while conserving fuel. 
 Pressure blower with modulating air control creates turbulence and distributes combustion air to secondary chamber. 
 Secondary burner with temperature activated modulating control provides fast preheat and   sustains high temperature performance at low energy consumption levels.  
Charging rate 

Up to 600kgs per ten-hour day of Type IV pathological waste or red bag waste rated at 2200 BTU’s per kg, based on batch loading twice daily.
Thermocouples (2 pcs/ each thermocouple assembled on the unit )
Thermocouples with pocket (1 pcs/each burner )
Nozzles (2 pcs/burner)
Nozzle line (1 pc/burner)
Glass fibre (2 roll/size)
Ignition electrode ( 2 pcs/burner)
High tension cable ( 2 pcs/burner)
Flame photometer (1 pcs/burner)
Burner primary chamber (1 set)
Burner secondary chamber (1set)
Control panel parts (1 set)
Fuse (1 pk from each rating )
Solenoid valve (1 pcs/assembled on the unit)
Burner oil filter  (10 pcs/burner)
Fuel pump (1 pcs/burner)
Shaft seal kit (1 set /shaft)
Seal plate gasket ( 1 set / plate )
Mechanical seal (1 set)
Flue gas restricting  ring bricks (1set)
Refractory cement (1 pk ) 
Shaft bearing (1 set)
V belts (1 set)

Waste Incinerator Chambers

A chamber of post combustion of gases

* A burner of combustion of gases,

* A device of injection of air allowing a total re-combustion of gases,

* A device of air inlet of cooling of waste gases,

* A sheath of evacuation of the gases burnt.

* Carcass in strong sheet steel with support of connection.

* Composition of the refractory;

Refractory concrete :

Thickness : ≥150 mm

Nature: 65% of Al203

Insulate in fibrous panel :

Thickness: ≥85 mm

 Nature: Calcium

* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of     electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.

* A secondary injection of air to ensure perfect oxygen content.

A control box ensuring the complete cycle of combustion.

 

Fan:

* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.

Controls and regulations:

Control box watertight to dust, including:

 

* A switch circuit breaker for each engine (ventilators and burners).

* A timer with adjustable temporization for the regulation of each burner.

* A regulator with digital watching for the temperature of combustion.

* A regulator with digital watching for the temperature of post combustion.

* Electric box.

 

21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual batch de ashing.

22. Process Filtering system: Scrubber to be mentioned as optional 

23. Emission Standards Compliance: BS 3316 or equivalent standard

23. Capacity to treat Plastic: Not less than 40% by weight

24. CE Manufacturing Compliance: BS EN 746-2-1997

The supplier must give batches of spare parts of first urgency and consumable of the incinerator.

The installed incinerator must bear a one year guarantee.

The supplier shall perform an onsite installation of the incinerator.

The technical training of operators will have to be provided and given by a technician    

from the factory; it will consist of curative and preventive maintenance, and the use of machine, etc

 

 

Waste Incinerators

10.A ready built fabricated room shall be supplied for housing the incinerator. The room will be designed in such a way that free space is  available  on all sides and heat radiation  kept at minimum and giving the operators an easy workable environment and ventilation. The materials will be sufficient structural thickness of mild steel angles neatly coated with metal primer and epoxy paint to withstand sea corrosion 
Smoke less burner unit with all accessories:
-Oil flow rate range (100-2500) B/D.
-GOR range (200-1000) SCF/D.
-API range (14-30).
-AIR supply: pressure (50-150) psi, flow rate (350) ft3/min.
-Water supply: maximum pressure (300) psi, flow rate water (1800) B/D.
-Pilot light: propane gas or gas & oil.
-Ignition: supply (400 V, 3 phase +N +T, 50 Hz) & (work at 55 c).
-Rotation device: one swivel joint allowing rotation of (75) each side of boom center line.
-Connections: (oil 2 in-L.P.) & (air 2 in-L.P. equipped with WECO hammer union fig. 602 – (water 2 in-L.P. equipped union fig. 602).

-Pilot gas 1/2 in-L.P.
•    Installing a readymade concrete base (Precast) with Height 30 cm above the ground and 20 cm below the surface of the earth. 
•    The dimensions of the base are increased by (2 meters) from the edge of incinerators 
•    The rest of the accessories in all the trends even allows the worker directly feeding and maintenance work, cleaning and move easily taking into account the tendencies of the base toward the door for drainage of water.
•    The floor coating must be high-quality epoxy paint.
•    Install anti-rust and heat Umbrella of brick and steel (pyramid shape) of (5) meters height above the ground which installed with the edge of the concrete base by thick galvanized columns 
•    This umbrella Cover the site furnace and allow bringing the chimney
•   The site is surrounded by an iron fence (sheet metal) 3 meters height from the surface of the earth in order to protect the incinerators from dust storms 
•    The iron fence must have a 5 meters Width gate 
•    Automatic anti-rust and heat electrical circuit must be provided 
•    The furnaces are highly efficient, emissions-free, safe, and environmentally friendly and have capacity of not less than 3,000 kg of materials and the rate of burning at least 400 kg / h
•    The method of feeding the furnace through a side slot or from the top and the emission of the smoke is completely prevented.
•    a furnace Must have two rooms, one of them is the  main room of not less than the “5” stoves to the process of burning materials and other secondary room of not less “2” stoves to burn resulting gas from the first process as well as the chimney
•    The main component of the body of the furnace is stainless steel box, the thickness of not less than 7 mm with a layer of zinc phosphate plated with aluminium reflector to heat
•     the thickness of the door of 150 mm and a hardness of not less than 170 kg / m 3 to be burnt, automatic comprehensive remote system.
•    Furnaces must be destructive enough to burn and incinerate the material which mentioned previously 
•   furnaces must have certificates are supported global enterprises and government competent for environmental protection In the country of origin or the General Presidency of Meteorology and Environment Protection in Saudi Arabia
•    The oven can work for 24 hours so as to allow for the burning of materials for a period of not less than 12 consecutive hours and the remainder for cooling and provides full fuel tank with a capacity of 1000 L to turn on the oven.
•    Must have an automatic ignition and diesel is used
•    a furnace has the ability to withstand extreme temperatures up to “130o c And also, it guarantees continuous operation of which can be utilized for 24 hours with the ability to remove residues during the work of the oven, Insulating layer of calcium must be present in the rooms with Thickness not less than 50 mm and a wall thickness of 100 mm 
•    Isolation of burning room: the space between the walls must be of the “stainless steel”. In addition, burn room must fill with Thermal insulation material.
•    Ensure that the combustion of materials emitted in the secondary room should be at least two seconds period and the room is lined with high-density ceramic fibbers
•    Incinerators must contain a system for processing (purification) gasses before emission of the smoke.
•     Incinerators must have the capacity of self-cooling after the end of the daily operating period.
•    Incinerators must have chimney not less than “4 meters” height from the surface of the oven, also, it must be thermally insulated and non-rust able, and must also be removable, installation and tide default.
•    Electrical capacity required “220/ 380-volt “60 hertz
•    Incinerators must be fitted with a control panel of the electronic keys to monitor all the necessary indicators of activation keys, as well as start-up and switch off so as to be isolated inside a metal box with the presence of the following:
Alarm Sensor in the event of (crashes “burner” or purification device or heat leakage       or internal connections and wiring)
Monitors for the temperature of the rooms
Aerosols Filter indicators/ monitors
Room temperature sensors 
Indicators for furnaces and index overload
Timer for Extinguish the oven automatically depending on the time required. 
•    All equipment must be highly resistant to external conditions such as high temperature (50oc) 
•    All doors must have special lock are not allowed non-persons appointed to work.
•    Providing fire extinguisher for each site with a capacity of 10 kg at least
9.Metal fuel tank from black steel (capacity not less than 2500 litres) and shall be installed at the incinerator Room. The tank shall be provided with all necessary fittings including fill, vent, drain and overflow line, level indication and access for inspection and maintenance. Level switches shall be provided for the following services.

             (a) Low level alarm
            (b) High level alarm
             (c) Low level start of transfer pump
             (d) High level stop of transfer pump

Industrial MultiWaste Incinerator System

Design, installation and commissioning of multi industrial waste incinerator. 
Capacity: 315 KG/HOUR SOLID WASTE/ OR 200 LITRES/HOUR LIQUID WASTE (with dual chamber system)
1st chamber-870 Deg.C – 900 Deg.C
2nd chamber-1000 deg.C – 1200 Deg.C
Incinerator should have following criteria:
radiant temperature
Advanced gas treatment system to avoid emission of toxic gases (scrubbing system).
Low consumption high efficiency compact automatic burning system.
Low running and maintenance costs
Fully automatic and simple to operate control panel
Afterburner Preheat
Dense refractory concrete lining rated at 1600 C
Solid Hearth to allow maximum Burnout
Large Top opening lid for easy loading
Wide door for ash removal
Optional Stainless Steel Casing
Heat recovery option
It has special metal seal structure, refractory, bricking art, air distribution of multi-stream circling and advanced end-gas treatment without second pollution.  Provide automatic control for users.  The system should passed appraisal, fill up national blank and become substitute for import products. It should have notable economic and social benefit.
          1). Ignition transformer
             2). Ignition rod
             3). Digital temperature indicator
             4). Temperature controller variable
             5). Thermo couple (heat sensor)
             6). Flame detector
             7). U.V. Sensor
             8). Electromechanical Solenoid valve
             9). Low and high fire control governor.
            10). Eye hole for visual indication.
            11). Venturi Scrubber filtration system for smoke control emission.
            12). Liquid spraying nozzles with the capacity of 25 % (20 nozzles).

Incinerator Secondary chamber gas residence time

Secondary chamber gas residence time shall be minimum 1 second at 1050 oC.
Primary Chamber:
Type: Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC
Insulation thickness: approx.115mm thick
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Ash Removal: Manual/automatic
Secondary Chamber:
Type : Static Solid Hearth
Material of Construction: Mild Steel, 5mm thick
Refractory thickness: approx.115mm thick
Material: Refractory bricks confirming to international standard.
Temperature resistance: 1400 oC.
Insulation thickness: approx.115mm
Material: Insulation bricks confirming to international standard.
Waste Charging: Manual & Automatic waste charging.
Emergency Stack:
Type: cylindrical, top mounted on venturi ejector.
Material of Construction: Mild Steel, 3mm thick.
Refractory: 75mm thick castable.
Insulation: 25mm thick castable.
Quencher:
Material of construction of outer body: Mild Steel refractory lined from inside.
Shall have water circulation system with centrifugal pump.
It shall have to reduce flue gas temperature before venturi scrubber.
Shall provide pump motor of suitable capacity.
Air Pollution Control Device C Venturi Scrubber
Type: High pressure jet type.
MOC: Stainless steel C 316L.
Temperature at the outlet: 78-80 oC
Scrubbing Media: Water with 5% caustic
Re- Circulation Pump for Venturi Scrubber
Type: Centrifugal
Application: PP/SS
Piping : PPR
Droplet Separator & Re-Circulation Tank (Integral)
Type: Cyclonic
Application: To separate water droplets from flue gases
Material of Construction: Mild Steel Rubber lined 3mm thick
I.D. Fan:
Type: High pressure centrifugal
Material of Construction: Stainless steel 304, impeller and mild steel rubber lined casting
Drive: Bel
Combustion Fan:
Type: Centrifugal
Modulation: Manual damper control
Material of Construction: Mild Steel
Drive: Direct drive