SHARP MEDICAL WASTES

A SET OF INCINERATOR FOR DISPOSAL OF SUCH HOSPITAL SHARP WASTES LIKE THE NEEDLES,SYRINGES,CUTTERS, BLADES, ETC.

WASTE BUCKET/TANK – ABOUT 2000KG
CAPACITY OF FEEDING: ABOUT 600-800Kg AT A TIME.
BURNING AT ABOUT 150/165-200 IN 60MINS
THE BURNER SHALL USE DIESEL/OIL
WITH CHIMNEY, ELECTRIC PANNELS,ELECTRIC MOTORS,ETC.
MATERIALS FOR DISPOSAL: SHARP MEDICAL WASTES.

Mixed Biomedical waste Incinerator

Product              :Mixed Biomedical waste Incinerator
Quantity             :60 units
Contract period:To be decided by the supplier

Please confirm your willingness to execute this contract project by sending brochure and your price quotation for the below specification to enable us submit it to the firm incharge of the contract for their study and approval.

Type of Waste: Mixed Biomedical waste.

1. Waste burning capacity of unit: 100-125 kgs / hr.
2. Mode of waste handling : Autoloading– DFDV + Bucket elevator
3. Type of fuel : LDO / HSD
4. Type of Burner operation : Automatic
5. Expected fuel consumption: 30-35 kgs/hr **(depending upon overall
mix of the waste, moisture
content, etc.) after preheat.
6. Connected electrical load : Approx. 7-8 KW (AC 3 phase,220V, 50 Hz).
7. Overall space requirement : 9 m (L) X 8 m (W) X 6 m (H) Each unit
without stack

Burners temperature controlled (TIC – Thermocouple) and work on ON –
OFF basis. The frequency on ON – OFF will depend upon the nature of
waste, moisture content, calorific value, etc. and shall vary from waste to
waste. The fuel consumption also depends upon the frequency of the door
opening and method of operation of the incinerator. We have mentioned
approx. expected fuel consumption figures.

The Incineration System comprises of :

I. Main Incinerator with
A. Primary & Secondary Chamber Modules duly refractory lined, piped & wired.
B. Bucket elevator + DFDV mechanism for autoloading and Deashing
mechanism
II i. 1 No. fully automatic Fuel Oil burner for primary chamber.
ii. 1 No. fully automatic Fuel Oil burner for secondary chamber.
III. Centrifugal forced draft fan assembly complete with motor drive, duct and
dampers, etc. mounted on the common skid of the unit to provide :
Combustion air.

Eductor air.
IV. Eductor Assembly for :
Cooling of exhaust gases from 900 – 1000 0 C to around 350 0 C .
Keeping the entire system under negative pressure to avoid hot gases / dust
particles rushing out of charging door.
V. Electrical Control Panel along with safeties, and Audio / Visual
indicators and
/ or alarms for efficient and safe operation of the system.
VI. Electrical wiring of the unit.
VII. Oil tank of 1000 ltrs capacity mounted on the skid
VIII. Operating tools and tackles comprising of – rake, hoe, shovel (I No. each).
IX. Chimney of  2.5 Mtr height.

WASTE INCINERATOR

INCINERATOR (WASTE INCINERATOR)

Designed to burn disposables that can and should be destroyed on-site. Theses wastes include infectious and contaminated “red bag.” Surgical dressings, plastic test devices and other wastes

Fast, complete, efficient waste disposal

Dual chamber combustion, Chambers insulated and lined with high temperature refractory. Programmable digital temperature controls, temperature indicators and charge recorder. Modulating control for fuel and air lowers fuel consumption.

Minimum installation and start up time

Aluminized steel jacket lined with refractory and firebrick. Monitors recorders and other accessory equipment should be available.

Charging system:

  • Vertical charge door on primary chamber.
  • Pneumatic or hydraulic ram charging system.
  • Auto shut down of the door after charging.
  • Primary and secondary chamber temperature displayed and recorded (optional)

Charging rate:

  • Up to 100kgs per hour of waste or red bag waste rated at 2200 BTU’s per kg.

Fuel:-         Natural Gas

Capacity (Cubic Mtr):   1.65M3 or more

Ave Capacity:      100kg per hour

Secondary Chamber Capacity (CubicMtr) :3.88 or more

Length (mm):      1880 or better

Width (mm):       1280 or better

Height Incl. Flue (mm):         7700 or better

Ash Door Opening (mm):   475×900 or better

Min. Operating temperature:         90 degree centigrade

Max, Operating Temperature:       1350 degree centigrade

Residency time in Second Chamber:       2 sec

Temperature Monitoring: Both for primary and secondary chambers.

Loading SystemManual/semi-automatic

Waste destruction efficiency:> 90% by weight

Filter: Ceramic or other equivalent filters in order to reduce the induction of hazardous air pollutants, particulates, co,dioxin/furane into the atmosphere.

De ashing system: Manual/semi-automatic.

The System must be quoted complete with:-

  • Plumbing
  • Electrical panels
  • Civil works
  • Waste collection Trolleys

 

Finish/ Paint:-

High Quality heat resistant, two layers high-grade epoxy Paint coating.

Installed Power (Electric Voltage): 440V/ 50 Hz

Waste Management Equipment must have ;

Mobile loading trolley: 06 No’s – For transportation of hospital waste from wards to incinerator site/ room, Opening from the top.

WASTE BINS MOBILE: 06 No’s-Made of Plastic, in blue color with a cover flap.

Plastic Bags:       2000 no’s each in Red and Yellow color.

Heavy Duty Gloves Pairs: For Waste handling staff-06 Pairs

Long Shoes Pairs:         For waste handling – 06 Pairs.

Make: UK, Europe, USA, Japan

Chamber Double Incinerator

Chamber Double Incinerator:

Burning Rate      10 kg per hour (for two incinerators)

Burning Rate     20 kg per hour (for three incinerators)

Loading   Method   Manual

No of Burners   Single for 10 kg/hour and Double for 20 kg per hour

Fuel                    Diesel and Natural Gas

Warm Up Time    Not more than 20 minutes

Temperature controller   Digital

Power Supply      Single Phase 220V

Chimney Height    20 feet from ground level

Wet and Dry Scrubbers   Optional

 

Gasified incineration for burning medical wastes

Gasified incineration for burning medical

wastes.

 

Fuel type: Natural Gas

Burning Capability:

–   30-50 kg/time

–   Daily 3-6 times

 

Incinerator size: max 2000x1200x3200 mm

Burning room volume:

–   Gasification room max 0.7 m3,

–   Secondary burning room max 0.5 m3,

 

Size of the filling entrance: max 650×850 mm

Air blower: max 0,5 kW

Combustion-support combustion machines:

–   Power max 0,2 kW

 

Re-burning machine: Power max 0,2 kW Voltage: 220V / 380V

Weight: max 5000 kg

User Manual Language: English

Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant.

 

Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant.

Requirements:

  1. Incinerator system complete with scrubber, pollution control system, water system, loading system, ash removing system and if anything more option is available. we have to burn 10000kgs/day, We work 8 hours a day, so your incinerator should have capacity to burn atleast 1400 or 1500kg/hr of waste.

 

supply 02 primary combustion chamber, and continuation feeding or alternately. each primary combustion volume is 4.0 M3, total 8 m3.

  1. With complete system specification, power, water fuel requirements.

 

  1. Space requirements & floor plan

 

  1. Pre-installation requirements. Space, power, water, drainage system etc

 

  1. Fuel type” diesel or gas?

 

  1. All options available.

 

  1. You have to send your technical team for installation, user training, maintenance training for end user technicians.

 

  1. Maintenance schedule—what has to be done, daily, weekly, quarterly, half yearly, annually.

 

  1. What are the replacement items during one year.

 

  1. Your system should meet all local & international standards with respect to handle of tobacco dust before feeding to incinerator, gas emission, waste water discharge to public drain system, ass disposal etc.

 

  1. End used will send this dust to incinerator plant in bags of 300kg each, so we are expecting 35 bags of 300kg each per day, 7 days a week.

 

 

  1. How many engineers or technicians you will send for installation, how many people, what machines & tools you want us to mobilize to facilitate your people to do the installation. how many days installation & training will take.

 

 

  1. What will be your charges for installation visit.

 

 

  1. If you have some picture of such big installations, references(within this region is helpful if you have), you can provide us.

 

 

 

 

 

Incinérateurs

Carburant Diesel
Capacité (M3) 1.92
Ave Capacity 1200kg
Consommation (litre/heure 12
Dimension externes
Longueur (mm) 3110
Largeur (mm) 2150
Hauteur (mm) 3200
Ouverture Porte 1000×2000
Dimension internes
Longueur (mm) 2200
Largeur (mm) 1050
Hauteur (mm) 800
Opération
Minimum température d’opération 950
Maximum température d’opération 1320
Température de suivi oui
Thermostat oui
Ventilateur oui
Chambre de combustion secondaire 2 secs
garantie minimum 12 mois

TECHNICAL SPECIFICATION FOR MEDICAL WASTE INCINERATOR (50 – 60kg/hr)

COMPLIANCE (YES, NO or COMMENT)
Item

Description

Medical Waste Incinerator, 50 to 60

Kg/hr

Item Quantity 5 No.
Support Health Sector Support Project
Point of Installation (Hospitals) Moi Voi, Makindu, Maragua, Eldama Ravine and Isiolo District Hospitals
1.     General Description

Supply, delivery, installation and commissioning of a medical waste incinerator suitable for disposal of Medical, General and Pathological waste in a safe and clean environment. The unit shall consist of two chambers and operate on the principal of controlled air and temperature. The unit shall consist a particulate remover (scrubbers) as stipulated in waste management regulations, 2006 (Legal notice NO. 121 of 29th September, 2006). The Unit shall be fully automatic and controlled by an automatic electronic controlled system except loading system which shall be manual.   The unit shall be capable of incinerating between 50 to 60 kg of solid medical waste per hour. It shall be constructed from mild or aluminized steel lined with refractory material.

 
2.   Composition

2.1     Main unit

2.2   Accessories

 
3.   Performance specifications  
3.1 Main unit    
3.1.1 Application For incineration, general and pathological
3.1.2 Capacity 50 – 60 kg/h burn rate
3.1.3

 

Type Two combustion chambers type; primary and Secondary, controlled/forced combustion air type with a flue gas emission scrubbing unit
3.1.4 Operating time Minimum 8 hours daily
3.1.5 Operating temperature From 850 0C to 1200 0C, Automatic controlled
3.1.6 Residual Ash 5 to 10%
   3.2       Primary Chamber
3.2.1

 

Construction Constructed from heavy duty mild or aluminized steel Or

equal and approved equivalent

3.2.2

 

Insulation material Refractory material lining similar or equal to calcium

Silicate and hot face combination of heavy duty brickwork

3.2.3

 

Internal Construction Fixed hearth type complete with gratings, concave bottom

and charging door, lined with refractory material

3.2.4

 

Charging Door Suitable for manual loading of wastes and with smooth

Dear seal equivalent of Ceramic seals with hinges.

3.2.5 Door Lock Automatic, Electric type
3.2.6

 

Ash removal door Provided, for removing resultant bottom ash leftovers                             from the Primary chamber
3.2.7 Gratings Provided
3.2.8 Loading Manual loading of waste
3.2.9

 

Primary Burner Fully automatic, with fuel, temperature and speed controls with ignition system, flame detector, Air fan complete with safety features, flame failure, Diesel fired fuel injector type and Flange mounted
3.2.10

 

Blower Provided. For supplying excess combustion air through the distribution system with speed control system
3.2.11 Temperature Minimum exit 850 0C
3.2.12 Observation port To be provided with protective glass type
3.3       Secondary chamber
3.3.1

 

Construction Constructed from heavy duty mild or aluminized steel or equal and approved equivalent
3.3.2

 

Insulation Refractory material lining
3.3.3

 

Combustion Temperatures Above 850 0C, controlled electronically
3.3.4

 

Gas residue or retention Time > 2 second at minimum 850 0C  
3.3.5

 

Secondary Burner Provided, Diesel fired, fully automatic, with fuel, temperature and speed controls, With ignition system,                                                                   Flame detector, Air fan, Complete with safety features, flame failure Diesel fired fuel injector type.                                                                   Flange mounted
3.3.6 Ejector Provided, Venturi type, for cooling the flue gases
3.3.7

 

Combustion Air Fan Provided for supplying combustion and creating a negative drift and turbulences
3.3.8 Temperature Maximum 1600 0C
   3.4       Chimney
3.4.1

 

Construction Constructed from heavy duty mild or aluminized steel   or equal and approved equivalent                                                                   Refractory material lining
3.4.2 Length 10 m above ground
3.4.3 Bore about 350mm diameter
3.4.5 Discharge temperatures About 850 0C
3.4.6 Emissions To comply with standards in section 9 of third schedule of the waste management regulations, 2006.
   3.5         Electrical System
3.3.5

 

Control unit Fully automatic with microprocessor based control                                                                       unit (PLC) automating all operations of the                                                                       incinerator. Capable of monitoring all incinerator parameters With large LCD or similar for display of all progress

Parameters i.e. temperature of primary and secondary chambers, turbulence and time

With status lamp

With user of defined and differed programmed operating cycles for different type of loads/conditions

With safety interlocks, display of errors and visible and audio alarms.

System for continuous emission monitoring

3.5.2

 

Isolator switch Supply and install isolator switch 240V, 100A for the                                                                     incinerator unit, including all necessary cables 10m
3.5.3

 

Distribution Board Supply and install distribution board. 100 A, complete with MCBs suitable for the rating of the incinerator unit and associated equipment. Wiring     to be done according IEE regulations.
3.5.4

 

Wiring Make provisions for wiring the isolator switch, Distribution Board control unit to Incinerator and all associated equipment inside to incinerator room.                                                                         Working length 20m. Wiring to be done using PVC Sheath cable on steel conduits and trucking and in accordance with IEE regulations
3.6     Fuel System Supply and install storage fuel tank inside the incinerator room at an elevated position (about 1.5 m above the floor)
3.6.1

 

Fuel Tank Tank capacity, 400 liters, constructed from preferable suitable metallic material or high temperature resistance material
Fuel type Diesel
3.6.2

 

Fuel Lines Supply and install fuel lines, complete with fuel filters, pump, sight glass, fuel level and all other safety devices and connect from fuel tank to incinerator.

Working length , 20m

Fuel pipe material; Special copper pipes or similar                                                                         and approved materials

4               Physical characteristics  
4.1 Main unit Floor mounted, stand alone, fixed hearth type
Dimensions About 1.2 x 2.2m (WxD)
5   Operating environment    
5.1 Power Requirements 240V,A/C 50Hz, single phase, with PE
Ambient temperature 10 0C to 40 0C
Relatively humidity 40% to 90%
6. Accessories  
Rack, 2 m long 1 piece
6.1 Waste cart, stainless steel 1 piece
7 Spare parts
7.1 Burner 1 set
7.2 Fuel Filters 6 sets
7.3

 

All other spare parts                     required for replacement during and after 12 months of operations. 2 pieces of each
8               Quality Standards  
8.2

 

Manufacturing standards NEMA Kenya Act, 1999

Legal Notice No.121 of 29th September 1999 on waste Management Regulations

EU waste incinerator Directive- EC 76/2000

BS 3316

WHO Emission Standards

World Bank Emission Standards

or any other internationally recognized standards

Conformity to standards CE marked or any other internationally recognized documents
9         Local back up service
9.1 Available Should be available locally
9.2 Capacity to service equipment Manufacturer/Agent shall have adequate facilities, spare parts, qualified and skilled technical staff to offer comprehensive maintenance   service and spare parts sales for the lifespan of the incinerator
10         Delivery point  
10.1 KEMSA For inspection and verification
10.2

 

Moi Voi, Makindu

Maragua, Eldama Ravine and Isiolo Hospitals

For installation, testing, NEMA Certification and commissioning
11 Pre installation works

 

Provide for foundation plinth, necessary plumbing works, Fuel piping works, Elevated Diesel oil storage tank, electrical works including cabling, trunking and switch gears required to install the incinerator and all its accessories to required IEE standards
12 Installation and testing Complete installation and set up of the incinerator at designated as per manufacturer’s instructions

Provide fuel and test run the incinerator for 3 hours daily for 7 days

13          Training  
13.1

 

User training On site user training on operation and daily up keep
13.2

 

Maintenance training On-site maintenance training on Preventive Maintenance, repair and trouble shooting
14 Technical Documentations  
14.1 User manuals 2 sets
14.2 Service manuals 2 sets
14.3 Drawings 2 sets
15         Commissioning  
15.1 Testing and Commissioning of the machine to the satisfaction of the user
16 Warranty
16.1 Equipment Minimum of one year after commissioning on all parts.
16.2 Equipment system Nil
17.   Maintenance contract
17.2 Comprehensive preventive & repair           service Provided a 12 months comprehensive preventive and repair service contract inclusive of spare parts and material from date of commissioning