a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner

The incinerator should be a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner. It 
should employ a temperature based logic control system to provide optimum control of the operating conditions and incorporate a high capacity 
thermal oxidizing secondary chamber. It should be designed to retain the exhaust gases, for at least 2 seconds to ensure the unit’s effective 
destruction of the combustion products.  
i. Waste type Health care waste  
ii. Waste density 125 to 350Kg/M3  
iii.. Waste Calorific Value 4000 KCAL/Kg  
iv. Moisture content 10-25%  
v.  Estimated ash  residue 5-10%  
vi.  Nominal capacity  50Kg/hour batch load  
vii.  Secondary chamber 2 seconds @ 850°C  
The primary combustion chamber is the main structure of the incinerator, fabricated from mild steel plate and stiffened with rolled steel 
sections. It is carried from the floor level on a substantial steel support frame. Internally the shell is lined with calcium silicate 
insulation and a hot face combination of super duty brickwork or high strength castable.  
The primary combustion chamber must ensure minimum exit temperature is not less than 850°C.  
One Manual Load Incinerator comprising:  
•         Manual Loading door  
•         Horizontal solid hearth, refractory lined primary combustion chamber. Approximate dimensions 800 mm diameters x 2100mm long  
•         Full sized bulk load/ash removal door  
•         1 off diesel-fired ignition burner — temperature controlled  
•         1 off combustion air supply fan and distribution system, automatic control  
•         High capacity secondary combustion chamber with residence time not less than 2 seconds @ >850°C  
•         1 off diesel-fired afterburner — temperature controlled  
•         Control panel — automatic operation  
ð      Temperature indication primary and secondary chambers 0-1200°C   
ð      Refractory lined flanged chimney to a height of 10M above ground level  
50kg/hour at a nominal calorific value of 4,000 kcal/kg and an average bulk density of I20kg/ M3 for general waste and l60kg/ M3 for health 
care waste.
(1) Moi Voi District Hospital
(2) Makindu District Hospital
(3) Gabartonjo Hospital in Baringo County
(4) Isiolo District Hospital
(5) Kigumo Hospital in Murang’a County  
Posted in epost.